Completion of the Mularroya tunnel excavation
The Mularroya Tunnel, 13.3 km long and designed to transfer up to 8 m3/s of water from the River Jalon to the Mularroya reservoir, is
TYPSA has been supporting public, private and institutional clients for more than 50 years, developing transport, water, building, renewable energy and rural development projects from concept through to commissioning and operation.
The Mularroya Tunnel, 13.3 km long and designed to transfer up to 8 m3/s of water from the River Jalon to the Mularroya reservoir, is
On World Water Day, at TYPSA we would like to share our vision concerning 21st century critical challenges, challenges intensified by factors such as climate
TYPSA first opened an office in A Coruna in 2005, and now boasts nearly 20 years of presence in the region. The initial office was
©2022 TYPSA Group