Water planning actions call for REACTION
Leaky plans Just as the blackout of 28th April 2025 exposed the fragility of an electricity system we assumed was resilient, the floods in Valencia
TYPSA has been supporting public, private and institutional clients for 60 years, developing transport, water, building, renewable energy and rural development projects from concept through to commissioning and operation.

Leaky plans Just as the blackout of 28th April 2025 exposed the fragility of an electricity system we assumed was resilient, the floods in Valencia

Installation of a new spillway to improve the safety of a mining dam Introduction Commissioned by the mining company VALE, ENGECORPS has developed the conceptual design to reinforce the Maravilhas II dam, implementing measures to ensure the dam’s safety

The Joint Venture will help Anglian Water Services (AWS) strengthen long-term water resilience in eastern England TYPSA, together with Stantec, has been appointed as lead consultants for