
Water planning actions call for REACTION
Leaky plans Just as the blackout of 28th April 2025 exposed the fragility of an electricity system we assumed was resilient, the floods in Valencia
TYPSA has been supporting public, private and institutional clients for 60 years, developing transport, water, building, renewable energy and rural development projects from concept through to commissioning and operation.

Leaky plans Just as the blackout of 28th April 2025 exposed the fragility of an electricity system we assumed was resilient, the floods in Valencia

Continuing the work carried out on the Eglinton Crosstown West Extension The Yonge Subway Extension, north of Toronto (YNSE) is one of the most significant investments in the region’s mobility plan. Line 1

Introduction Commissioned by the mining company VALE, ENGECORPS has developed the conceptual design to reinforce the Maravilhas II dam, implementing measures to ensure the dam’s safety and compliance with