Democratic Republic of the Congo

Port of Kalundu

Client

Cellule Infrastructures

Year

2025

Construction budget

USD 17,4 million

Key facts

Located on Lake Tanganyika, the port is experiencing frequent flooding issues.

The port serves as a logistics corridor for the country.

The total quay length is 530m, with port structures being raised by 2m .

Services

Preliminary study, preliminary design, and detailed design. Includes a socioeconomic study, analysis of lake dynamics, and the field campaigns required to draft the preliminary design for the reorganisation and modernisation of the port and its access.
Kalundu_26

TYPSA is designing the climate change adaptation of Kalundu Port

TYPSA has prepared the design for the refurbishment and expansion of the International Port of Kalundu (Uvira, South Kivu, Democratic Republic of the Congo), a...

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.