Key facts
New lines 2 and 4 and connecting interchange station.14 km long in total with 14 Cut-and-cover underground stations. Station serving the International Airport. Double-track monotube tunnel.
Geology: submerged Lima gravel. Construction method: multimode TBM (Slurry / EPB) with 10.20 m outer diameter. Stations and shafts with retaining walls.