Key facts
The project is part of a 10 km double track section.
Design speed: 200-250km/h.
The 290 m tunnel is a subsection of the approximately 7 km long tunnel in Drammen, where the geotechnical conditions are extremely complex:
– The existing soils are glaciofluvial deposits, consisting mainly of dense sand and gravel and containing boulders of different sizes.
– Most of the tunnel will be excavated below the water table.
– The tunnel will be excavated under a densely populated area with a crossroads and buildings where overburden heights are less than the tunnel diameter.
– Subsection tunnelled in mixed soil and rock ground conditions (location that requires a special design).
Large span tunnel (14 m width) excavated using a sequential method (SEM) with intensive ground treatment.