Saragossa, Spain

VENDIMIA SOLAR CLUSTER

Client

LIGHTSOURCE BP

Year

2022

Key facts

Five solar photovoltaic plants: Calamocha II, Escucha II, Híjar I, Peñaflor II and Tambores I, with a combined installed capacity of 250 MWp.

The plants are connected to the electricity grid through the 30/132 kV Almochuel substation, equipped with two power transformers, and two high-voltage overhead transmission lines extending to the existing Escatrón (20 km) and Híjar (18.8 km) substations.

Services

Owner’s Engineering services, including detailed engineering design review, construction supervision, quality assurance and control, health and safety coordination, environmental monitoring, oversight of testing and commissioning activities, and verification of compliance with applicable technical standards, regulatory requirements and project specifications.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.