Valencia, Spain

INFRASTRUCTURE RENEWAL ALAMEDA-MARÍTIM SECTION OF THE METROVALENCIA NETWORK

Client

Ferrocarrils de la Generalitat Valenciana

Year

2026

Key facts

2.5 km-long metro tunnel in operation on Metrovalencia Lines 5 and 7.

Structural rehabilitation of the diaphragm walls: surface cleaning, hydrodemolition of damaged concrete, reinforcement protection, and application of sprayed repair mortar. The works also include improvements to the tunnel lighting installations.

Drainage and waterproofing improvements, including joint sealing and refurbishment of drainage channels.

Track renewal, replacing Stedef-type sleepers with bonded slab track fastenings.

Services

Project design, construction management and supervision.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.