HIGH-SPEED MEDITERRANEAN CORRIDOR. MURCIA-ALMERIA SECTION. NIJAR-ALMERIA SUBSECTION

Client

ADIF

Year

2018

Construction budget

EUR 154 million

Key facts

Project length: 28 km. Single track railway. Rugged terrain. 16 viaducts (1414 m Viaduct over the River Andarax). 1 tunnel (878m).

Services

Detailed design. Environmental adaptation of the alignment to comply with the EIS, environmental analysis and land classification, design of preventive and corrective actions, water protection (ponds and barriers), waste management, wildlife crossing improvements, anti-collision measures and exhaust systems, bullfinch habitat enhancement, atmospheric protection, noise barrier screens and sub-ballast anti-vibration mats, cultural heritage protection, etc. Environmental Monitoring Programme.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.