Lima, Peru

SOUTH PAN-AMERICAN HIGHWAY

Client

Norberto Odebrecht

Year

2017

Construction budget

USD 167 million

Key facts

Total length of 54.4 km. Remodelling of 5 high-capacity urban interchanges, service roads, 13 bus stops, 4 pedestrian walkways, 7 bridges built over motorways in operation, on/off ramps and auxiliary roads, 2 metal pergola structures, one 500 m viaduct comprising three different types: composite with a steel box girder lifted into place, composite with a launched steel box girder, and prefabricated beam; and an 800 m urban cut-and-cover tunnel, Benavides Tunnel.

Services

Study of alternatives, preliminary and detailed design, including geological and geotechnical studies.