Key facts
The aqueduct will carry and supply drinking water from El Realito dam to the city of San Luis Potosí.
3 pumping stations: 990 m head, 1 m3/s.
Water treatment plant: 1 m3/s.
6 receiving tanks located in San Luis Potosí.
132 km aqueduct between El Realito dam and the receiving tanks in San Luis Potosí.
55 km of asphalt roads between Tierra Nueva and El Realito.
Construction was completed in 2014.
Direct contribution to social development and integration.