Zaragoza, Spain

MULARROYA DAM

Client

Ebro River Basin Authority.

Year

2024

Construction budget

EUR 195 million.

Key facts

Central clay core rockfill dam, 82.5 m high with 4.7 million m3 in the dam body, granular shell material (transition material) and limestone riprap on both faces, 23.5 m high diversion dam, 13 km transfer tunnel to ensure an 8 m3/s reservoir inflow and 10 km of new roads.

Services

Construction control and supervision, analysis and monitoring of contractor’s QAP, topography control, quantity surveying, technical advisory services, quality control on site and during commissioning, preparation of Emergency Action Plan and first filling plan. 

Environmental construction supervision, including design of the measures to compensate impacts generated on the Natura 2000 Network.