Spain

MADRID – EXTREMADURA – PORTUGAL HSR. SECTION: CAÑAVERAL – EMBALSE DE ALCANTARA

Client

ADIF (Spanish Railway Infrastructure Administrator).

Year

2010

Construction budget

EUR 62.4 million.

Key facts

Project length of 6.5 km. Double track railway. 2 overpasses. 3 viaducts notably including the concrete arch viaduct over the River Tajo with a total length of 1,488 m and 324 m main span.

Services

Detailed design. Viaduct over the River Tajo designed in collaboration with Profesor J. Manterola.