Key facts
Total of 10 km. Road link to connect the south of the city with the El Callao district, crossing the city and historic centre. 1600 m tunnel under the River Rimac. Technically complex works on emblematic structures, such as the 17th century Trujillo bridge load transfer works to allow a tunnel to be built under the existing structure. Construction of 11 viaducts and 4 toll plazas.