Karachi, Pakistan
KARACHI WATER SUPPLY CANAL
Client
Year
2022
Construction budget
Key facts
Design flow of 5.26 m3/s.
Rehabilitation of 11.7 km of existing trapezoidal canal and construction of a new 9.76 km pressure GRP DN1900 pipeline.
Rehabilitation of existing pumping station (5.26 m3/s).
Connection of the pumping station to the K-III pipeline.
Reconstruction of 2 PRFV DN1900 rising mains over 1.84 km.
Rehabilitation and expansion of the drinking water treatment plant.
New 4.5 MW solar plant and 2.5 km of distribution line.
Monitoring and metering system (SCADA).
The Government of Sindh, Pakistan, has appointed IFC as Lead Transaction Advisor.