Spain – France

HSR SPAIN – FRANCE. SECTION: FIGUERES - PERPIGNAN

Client

TP FERRO

Year

2009

Construction budget

EUR 914 million.

Key facts

8.4 km single track double bore tunnels. 11 viaducts (3,500 m). Track and electrification. ERTMS Level 1 and 2 signalling (ERTMS/ETCS). Telecommunications (GSM-R) and traffic management (ERTMS/ETML).

Services

Preliminary design for the construction, operation and maintenance of the PPP Project. Final design supervision and works supervision for the Concessionaire.