Zamora. Spain

ESLA CANAL

Client

Duero River Basin Authority, Ministry of Agriculture and Fisheries, Food and the Environment

Key facts

Area: 15,800 ha irrigation area, of which 10,500 ha are irrigated, with a channel network. New main intake structure in the canal. Works to replace the trapezoidal channel with FGRP pipe along 3 km of the canal (1,000 to 500 mm diameter pipe). 7 new lateral intakes for tertiary network and supply to 724 ha. 5 km drainage collector with a 5 m3/s flow. Service road upgrade

Services

Study, diagnosis and proposals. Technical designs. Hydraulic and structural calculations. Hydrology.