Bahía Blanca, Argentina

CORTI WIND FARM

Client

Vestas

Year

2018

Key facts

Total power of 100 MW, 29 x V126/3.45MW

132/33 kV outdoor step-up air insulated substation (AIS) with a single busbar arrangement, one line and two transformer bays, two 60 MVA power transformers and 6 collector lines.

Line bay extension at Bahía Blanca outdoor 132 kV air insulated switching substation (AIS) with double busbar arrangement, for Transba.

132 kV HV interconnection line, 2 km overhead and 0.3 km underground, to connect the generation substation and the switching substation.

Services

Detailed civil engineering. Detailed electrical engineering review. Construction supervision