Seville, Spain

CENTENARY BRIDGE OVER THE RIVER GUADALQUIVIR

Year

1991

Key facts

Cable-stayed bridge. Precast concrete deck with 265 m main span and 2017 m total length.

Services

Detailed design and technical support during construction by MC2 (TYPSA Group).