Cádiz, Spain

NAVAL STATION ROTA

Client

Ministry of Defense and NAVFAC EUROPE & SOUTHWEST ASIA

Year

2013

Construction budget

EUR 135 million

Key facts

Demolition of existing buildings.

3 reinforced concrete floating caisson piers with a total length of 1,800 m and an auxiliary pier.

3.9 M m³ of dredging.

Pavements, fenders and bollards.

Electricity, water, fuel and communications.

Ro-ro ramp.

Access channel: 3,500 x 245 m with dredging depth of 15 m.

Manoeuvring dock: 300,000 m².

Pier 4 designed for Juan Carlos I Strategic Projection Vessel.

Services

Detailed design for piers 2 and 4.

Construction supervision of piers 1 (extension), 2 and 4 and of the auxiliary pier.

Detailed design, reduced scale physical model in the UPM Port Laboratory (Pablo Bueno) and environmental impact study of the access channel and manoeuvring dock.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.