Navarra, Spain

NAVARRE CANAL OPERATION SERVICES

Client

Canal de Navarra S.A.

Year

2020

Construction budget

EUR 625 million

Key facts

119 km long channel for a design flow of 45 m³/s. 9 tunnels totalling 15 km. 7 siphons totalling 23 km. One 330 m long aqueduct. 3 small regulation dams totalling 8 hm3. 2 hydropower plants of 30 MW and 20 MW respectively. A 37,611 ha irrigated area.

Services

Infrastructure operation and maintenance.