Jerusalem, Israel

JERUSALEM LIGHT RAIL NETWORK

Client

Jerusalem Transportation Master Plan Team (JTMT)

Year

2023

Key facts

The North section of the Brown Line is approximately 11 km long and has 17 stops.

The Blue Line section is 3.5 km long and has 5 stops.

Services

Preliminary design for the North Section of the Brown Line.

Detailed design for the Blue Line section.

For both lines: Railway systems (track, signalling, telecommunications, catenary system and substations). Safety and operation studies.