Cáceres, Spain

BRIDGE MONITORING OVER THE TAGUS RIVER AT THE ALCÁNTARA RESERVOIR

Client

UTE FCC Construcción – Conduril

Year

2025

Key facts

Detailed design developed by TYPSA in 2010 in collaboration with Professor Javier Manterola.

Bridge for the Madrid-Lisbon high-speed railway line. Concrete deck arch bridge, 1,488 m long and 324 m main span.

Auscultation during the construction of key parameters: tension forces, accelerations, movements, etc.

Later, during its commissioning, several accelerometers and temperature sensors were placed on the desk to determine its dynamic parameters, along with a line of levelling points to verify the deck´s horizontality. A photovoltaic system was installed to power the equipment, which transmitted the most significant structural behaviour data of the bridge via the web.

Services

Dynamic monitoring and study including complementary technical reports.

INTEGRITY COMMUNICATION CHANNEL

  • Data controller: TECNICA Y PROYECTOS, S.A
  • Purpose: your data will be used to process your request and provide you with our services.
  • Lawful basis for processing: the consent of the person concerned.
  • Legal rights: you have the right to know what data is stored about you, to correct it and ask for it to be deleted, as explained in the additional information available on our website.
  • Additional information: more information can be found in the ‘Privacy policy’ section of our website.