{"id":82179,"date":"2026-06-25T09:18:15","date_gmt":"2026-06-25T08:18:15","guid":{"rendered":"https:\/\/www.typsa.com\/?p=82179"},"modified":"2026-06-26T09:20:18","modified_gmt":"2026-06-26T08:20:18","slug":"designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane","status":"publish","type":"post","link":"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/","title":{"rendered":"Designed to be built: a new partnership between TYPSA and Optimus Crane"},"content":{"rendered":"<p><b><span data-contrast=\"none\">The partnership combines engineering, technological selection, constructability, logistics and installation to optimise wind projects from their earliest stages and reduce risks, costs and construction times.\u00a0<\/span><\/b><span data-ccp-props=\"{&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">TYPSA and Optimus Crane have joined forces to create \u201cTYPSA Heavy Lifting &amp; Constructability powered by Optimus Crane\u201d, a strategic partnership designed to tackle one of the main challenges currently facing the wind power industry: integrating engineering, technological selection, constructability, logistics, transport and installation into a single optimisation strategy.\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">TYPSA\u2019s international engineering and consultancy capabilities, combined with Optimus Crane\u2019s expertise in assembly methodologies, crane strategies, specialised transport and heavy lifting operations, create a unique offering in the market, linking project design with its future execution, thereby ensuring that all solutions are viable, efficient and optimised from a construction perspective. In contrast to the traditional separation between design on paper and on-site execution, the new partnership will operate under the motto <\/span><i><span data-contrast=\"none\">\u2018Designed to be built\u2019<\/span><\/i><span data-contrast=\"none\">.\u00a0\u00a0<\/span><span data-ccp-props=\"{&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">This partnership enables transport and assembly logistics to be integrated into every phase of the project, from the initial stages of preliminary engineering through to the advanced construction phases.\u00a0<\/span><span data-ccp-props=\"{&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">Optimising the LCOE (<\/span><i><span data-contrast=\"none\">Levelised Cost of Energy<\/span><\/i><span data-contrast=\"none\">) is a process that begins in the earliest stages of a project\u2019s development. It requires not only the optimisation of construction costs, but also a comprehensive strategic approach to tackling technological selection in conjunction with constructability and transport and assembly logistics, as well as effective management throughout the entire process of negotiating construction contracts and wind turbine supply agreements.\u00a0<\/span><span data-ccp-props=\"{&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<blockquote><p><span data-contrast=\"none\">This partnership is suitable for any national or international wind power project.<\/span><span data-ccp-props=\"{&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:2,&quot;335551620&quot;:2,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p><\/blockquote>\n<p><span data-contrast=\"none\">The increasing size of wind turbines and the complexity associated with their transport and installation make the early integration of these factors an increasingly critical necessity for the sector.\u00a0<\/span><span data-ccp-props=\"{&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">Through this partnership, engineering, constructability and installation are integrated to set a new standard in the development of wind power projects<\/span><span data-contrast=\"auto\">.<\/span><span data-ccp-props=\"{&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The partnership combines engineering, technological selection, constructability, logistics and installation to optimise wind projects from their earliest stages and reduce risks, costs and construction times.\u00a0\u00a0 TYPSA and Optimus Crane have joined forces to create \u201cTYPSA Heavy Lifting &amp; Constructability powered by Optimus Crane\u201d, a strategic partnership designed to tackle one of the main challenges currently &#8230; <a title=\"Designed to be built: a new partnership between TYPSA and Optimus Crane\" class=\"read-more\" href=\"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/\" aria-label=\"Read more about Designed to be built: a new partnership between TYPSA and Optimus Crane\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":82177,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[438],"tags":[],"class_list":["post-82179","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-corporate-information"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Designed to be built: a new partnership between TYPSA and Optimus Crane - Grupo TYPSA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Designed to be built: a new partnership between TYPSA and Optimus Crane - Grupo TYPSA\" \/>\n<meta property=\"og:description\" content=\"The partnership combines engineering, technological selection, constructability, logistics and installation to optimise wind projects from their earliest stages and reduce risks, costs and construction times.\u00a0\u00a0 TYPSA and Optimus Crane have joined forces to create \u201cTYPSA Heavy Lifting &amp; Constructability powered by Optimus Crane\u201d, a strategic partnership designed to tackle one of the main challenges currently ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/\" \/>\n<meta property=\"og:site_name\" content=\"Grupo TYPSA\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-25T08:18:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-26T08:20:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.typsa.com\/wp-content\/uploads\/OPTIMUS26.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"539\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cristina Ezquerra Boado\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Cristina Ezquerra Boado\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\\\/\"},\"author\":{\"name\":\"Cristina Ezquerra Boado\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/person\\\/4b798f83d9c8c4ea1c0fb471926d3aa3\"},\"headline\":\"Designed to be built: a new partnership between TYPSA and Optimus Crane\",\"datePublished\":\"2026-06-25T08:18:15+00:00\",\"dateModified\":\"2026-06-26T08:20:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\\\/\"},\"wordCount\":321,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/OPTIMUS26.jpg\",\"articleSection\":[\"Corporate Information\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.typsa.com\\\/en\\\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\\\/\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\\\/\",\"name\":\"Designed to be built: a new partnership between TYPSA and Optimus Crane - Grupo TYPSA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/OPTIMUS26.jpg\",\"datePublished\":\"2026-06-25T08:18:15+00:00\",\"dateModified\":\"2026-06-26T08:20:18+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.typsa.com\\\/en\\\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/OPTIMUS26.jpg\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/OPTIMUS26.jpg\",\"width\":1024,\"height\":539},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Designed to be built: a new partnership between TYPSA and Optimus Crane\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\",\"name\":\"Grupo TYPSA\",\"description\":\"Grupo TYPSA\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\",\"name\":\"Grupo TYPSA\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/logo-grupo-Typsa-300x300-1.png\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/logo-grupo-Typsa-300x300-1.png\",\"width\":300,\"height\":300,\"caption\":\"Grupo TYPSA\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/person\\\/4b798f83d9c8c4ea1c0fb471926d3aa3\",\"name\":\"Cristina Ezquerra Boado\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1782375736\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1782375736\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1782375736\",\"caption\":\"Cristina Ezquerra Boado\"},\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/author\\\/ceb\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Designed to be built: a new partnership between TYPSA and Optimus Crane - Grupo TYPSA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/","og_locale":"en_US","og_type":"article","og_title":"Designed to be built: a new partnership between TYPSA and Optimus Crane - Grupo TYPSA","og_description":"The partnership combines engineering, technological selection, constructability, logistics and installation to optimise wind projects from their earliest stages and reduce risks, costs and construction times.\u00a0\u00a0 TYPSA and Optimus Crane have joined forces to create \u201cTYPSA Heavy Lifting &amp; Constructability powered by Optimus Crane\u201d, a strategic partnership designed to tackle one of the main challenges currently ... Read more","og_url":"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/","og_site_name":"Grupo TYPSA","article_published_time":"2026-06-25T08:18:15+00:00","article_modified_time":"2026-06-26T08:20:18+00:00","og_image":[{"width":1024,"height":539,"url":"https:\/\/www.typsa.com\/wp-content\/uploads\/OPTIMUS26.jpg","type":"image\/jpeg"}],"author":"Cristina Ezquerra Boado","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Cristina Ezquerra Boado","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/#article","isPartOf":{"@id":"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/"},"author":{"name":"Cristina Ezquerra Boado","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3"},"headline":"Designed to be built: a new partnership between TYPSA and Optimus Crane","datePublished":"2026-06-25T08:18:15+00:00","dateModified":"2026-06-26T08:20:18+00:00","mainEntityOfPage":{"@id":"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/"},"wordCount":321,"commentCount":0,"publisher":{"@id":"https:\/\/www.typsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/#primaryimage"},"thumbnailUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/OPTIMUS26.jpg","articleSection":["Corporate Information"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/","url":"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/","name":"Designed to be built: a new partnership between TYPSA and Optimus Crane - Grupo TYPSA","isPartOf":{"@id":"https:\/\/www.typsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/#primaryimage"},"image":{"@id":"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/#primaryimage"},"thumbnailUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/OPTIMUS26.jpg","datePublished":"2026-06-25T08:18:15+00:00","dateModified":"2026-06-26T08:20:18+00:00","breadcrumb":{"@id":"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/#primaryimage","url":"https:\/\/www.typsa.com\/wp-content\/uploads\/OPTIMUS26.jpg","contentUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/OPTIMUS26.jpg","width":1024,"height":539},{"@type":"BreadcrumbList","@id":"https:\/\/www.typsa.com\/en\/designed-to-be-built-a-new-partnership-between-typsa-and-optimus-crane\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.typsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"Designed to be built: a new partnership between TYPSA and Optimus Crane"}]},{"@type":"WebSite","@id":"https:\/\/www.typsa.com\/en\/#website","url":"https:\/\/www.typsa.com\/en\/","name":"Grupo TYPSA","description":"Grupo TYPSA","publisher":{"@id":"https:\/\/www.typsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.typsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.typsa.com\/en\/#organization","name":"Grupo TYPSA","url":"https:\/\/www.typsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png","contentUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png","width":300,"height":300,"caption":"Grupo TYPSA"},"image":{"@id":"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3","name":"Cristina Ezquerra Boado","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1782375736","url":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1782375736","contentUrl":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1782375736","caption":"Cristina Ezquerra Boado"},"url":"https:\/\/www.typsa.com\/en\/author\/ceb\/"}]}},"_links":{"self":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/82179","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/comments?post=82179"}],"version-history":[{"count":1,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/82179\/revisions"}],"predecessor-version":[{"id":82180,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/82179\/revisions\/82180"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/media\/82177"}],"wp:attachment":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/media?parent=82179"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/categories?post=82179"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/tags?post=82179"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}