{"id":81967,"date":"2026-04-06T11:12:49","date_gmt":"2026-04-06T10:12:49","guid":{"rendered":"https:\/\/www.typsa.com\/?p=81967"},"modified":"2026-04-23T13:37:05","modified_gmt":"2026-04-23T12:37:05","slug":"connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india","status":"publish","type":"post","link":"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/","title":{"rendered":"Connecting tunnels between the Eastern Expressway and the Western Expressway in Mumbai, India"},"content":{"rendered":"<blockquote><p><span data-contrast=\"none\">Goregaon Mulund Link Road Project\u00a0<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p><\/blockquote>\n<p><span data-contrast=\"auto\">Since the end of 2024, TYPSA has been acting as Project Management Consultant (PMC) for the design, construction and operation of the twin tunnels that will connect Film City Goregaon with\u00a0Khindipada\u00a0(Amar Nagar) in Mulund, one of the most significant infrastructure projects on the new Goregaon Mulund Link Road (GMLR) in Mumbai, India.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The tunnels have a finished internal diameter of 13 and 14.5 metres, accommodating three lanes of traffic in each direction, as well as an emergency pedestrian walkway and integrated utility ducts, ensuring\u00a0high standards\u00a0of safety, operational\u00a0efficiency\u00a0and ease of maintenance. The design allows for a maximum operating speed of 80 km\/h, balancing capacity,\u00a0comfort\u00a0and safety for users.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The route runs\u00a0predominantly through\u00a0basalt rock formations, with cover ranging between 20 and 160 m, implying a wide range of geotechnical conditions. These factors have been decisive in\u00a0determining\u00a0the excavation\u00a0methodology, the support\u00a0systems\u00a0and the design of the final lining.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The tunnel portals are situated at different heights, 51 m above sea level on the Goregaon side and 33 m on the Mulund side, which has\u00a0required\u00a0careful control of the vertical geometry, as well as specific treatment of the transition zones between the surface and the tunnel.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"size-medium wp-image-81963 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_A26-800x439.jpg\" alt=\"\" width=\"800\" height=\"439\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_A26-800x439.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_A26-1024x562.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_A26-768x422.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_A26.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<p><span data-contrast=\"auto\">Excavation is being carried out using two newly manufactured tunnel boring machines, with a diameter and capacity suited to the design\u2019s conditions. The final lining consists of prefabricated reinforced concrete segments, designed to meet structural, durability and fire safety requirements. In addition, connecting galleries have been included between the tubes every 300 m, with an angular geometry, to ensure evacuation and operational safety\u00a0in the event of\u00a0an emergency.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">In addition to the excavated tunnels, the project includes significant works at surface level and on associated structures. The access roads total approximately 1.23 km, spread across the Goregaon, Mulund and Film City Gate sectors. On the Goregaon side, a further 1.44 km of box tunnels have been constructed, allowing for the gradual and functional integration of the tunnel portals with the existing road network.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">In total, the length of the road infrastructure developed is approximately 13.3 km,\u00a0comprising\u00a0tunnels, access roads and ancillary structures, and forming a strategic corridor for urban mobility.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">TYPSA plays a key role as a technical and management consultant, contributing its international experience in large-scale underground infrastructure. Its services encompass comprehensive project management, design review and assurance, contract\u00a0administration\u00a0and construction supervision.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">During the construction phase, TYPSA conducts an in-depth review of the designs developed by the contractor, covering geotechnical, structural and construction aspects, as well as the integration of services, safety criteria and advanced digital models based on BIM and LiDAR. This work ensures the technical consistency of the project and its suitability for the actual site conditions.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Furthermore, TYPSA carries out continuous supervision of the works, ensuring compliance with quality,\u00a0safety\u00a0and environmental standards. Advanced quality assurance and control systems are implemented, tests and trials are supervised, and the correct execution of the works\u00a0in accordance with\u00a0the approved designs is guaranteed.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><img decoding=\"async\" class=\"size-medium wp-image-81965 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_B26-800x673.jpg\" alt=\"\" width=\"800\" height=\"673\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_B26-800x673.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_B26-1024x861.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_B26-768x646.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_B26.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<p><span data-contrast=\"auto\">The safety of workers and users, protection of the environment and minimisation of disruption to the city are fundamental priorities in TYPSA\u2019s work. Within this framework, we oversee the implementation of environmental management plans, road safety during construction and coordination with local services and authorities.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Finally, TYPSA supports the project right through to its commissioning,\u00a0participating\u00a0in final testing, the validation of the infrastructure and its handover in\u00a0optimal\u00a0operating condition, thereby contributing to the technical and functional success of a strategic infrastructure for urban mobility.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The project is currently in its\u00a0initial\u00a0phase, and implementation is expected to continue over the coming years, shaping an essential infrastructure for modernising mobility and sustainable development in Mumbai.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:200,&quot;335559740&quot;:264}\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Goregaon Mulund Link Road Project\u00a0\u00a0 Since the end of 2024, TYPSA has been acting as Project Management Consultant (PMC) for the design, construction and operation of the twin tunnels that will connect Film City Goregaon with\u00a0Khindipada\u00a0(Amar Nagar) in Mulund, one of the most significant infrastructure projects on the new Goregaon Mulund Link Road (GMLR) in &#8230; <a title=\"Connecting tunnels between the Eastern Expressway and the Western Expressway in Mumbai, India\" class=\"read-more\" href=\"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/\" aria-label=\"Read more about Connecting tunnels between the Eastern Expressway and the Western Expressway in Mumbai, India\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":81961,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[440],"tags":[],"class_list":["post-81967","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-current-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Connecting tunnels between the Eastern Expressway and the Western Expressway in Mumbai, India - Grupo TYPSA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Connecting tunnels between the Eastern Expressway and the Western Expressway in Mumbai, India - Grupo TYPSA\" \/>\n<meta property=\"og:description\" content=\"Goregaon Mulund Link Road Project\u00a0\u00a0 Since the end of 2024, TYPSA has been acting as Project Management Consultant (PMC) for the design, construction and operation of the twin tunnels that will connect Film City Goregaon with\u00a0Khindipada\u00a0(Amar Nagar) in Mulund, one of the most significant infrastructure projects on the new Goregaon Mulund Link Road (GMLR) in ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/\" \/>\n<meta property=\"og:site_name\" content=\"Grupo TYPSA\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-06T10:12:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-23T12:37:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_26.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"539\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cristina Ezquerra Boado\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Cristina Ezquerra Boado\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\\\/\"},\"author\":{\"name\":\"Cristina Ezquerra Boado\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/person\\\/4b798f83d9c8c4ea1c0fb471926d3aa3\"},\"headline\":\"Connecting tunnels between the Eastern Expressway and the Western Expressway in Mumbai, India\",\"datePublished\":\"2026-04-06T10:12:49+00:00\",\"dateModified\":\"2026-04-23T12:37:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\\\/\"},\"wordCount\":628,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/AUTOPISTA_INDIA_26.jpg\",\"articleSection\":[\"Current News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.typsa.com\\\/en\\\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\\\/\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\\\/\",\"name\":\"Connecting tunnels between the Eastern Expressway and the Western Expressway in Mumbai, India - Grupo TYPSA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/AUTOPISTA_INDIA_26.jpg\",\"datePublished\":\"2026-04-06T10:12:49+00:00\",\"dateModified\":\"2026-04-23T12:37:05+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.typsa.com\\\/en\\\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/AUTOPISTA_INDIA_26.jpg\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/AUTOPISTA_INDIA_26.jpg\",\"width\":1024,\"height\":539},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Connecting tunnels between the Eastern Expressway and the Western Expressway in Mumbai, India\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\",\"name\":\"Grupo TYPSA\",\"description\":\"Grupo TYPSA\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\",\"name\":\"Grupo TYPSA\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/logo-grupo-Typsa-300x300-1.png\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/logo-grupo-Typsa-300x300-1.png\",\"width\":300,\"height\":300,\"caption\":\"Grupo TYPSA\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/person\\\/4b798f83d9c8c4ea1c0fb471926d3aa3\",\"name\":\"Cristina Ezquerra Boado\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776931717\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776931717\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776931717\",\"caption\":\"Cristina Ezquerra Boado\"},\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/author\\\/ceb\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Connecting tunnels between the Eastern Expressway and the Western Expressway in Mumbai, India - Grupo TYPSA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/","og_locale":"en_US","og_type":"article","og_title":"Connecting tunnels between the Eastern Expressway and the Western Expressway in Mumbai, India - Grupo TYPSA","og_description":"Goregaon Mulund Link Road Project\u00a0\u00a0 Since the end of 2024, TYPSA has been acting as Project Management Consultant (PMC) for the design, construction and operation of the twin tunnels that will connect Film City Goregaon with\u00a0Khindipada\u00a0(Amar Nagar) in Mulund, one of the most significant infrastructure projects on the new Goregaon Mulund Link Road (GMLR) in ... Read more","og_url":"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/","og_site_name":"Grupo TYPSA","article_published_time":"2026-04-06T10:12:49+00:00","article_modified_time":"2026-04-23T12:37:05+00:00","og_image":[{"width":1024,"height":539,"url":"https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_26.jpg","type":"image\/jpeg"}],"author":"Cristina Ezquerra Boado","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Cristina Ezquerra Boado","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/#article","isPartOf":{"@id":"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/"},"author":{"name":"Cristina Ezquerra Boado","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3"},"headline":"Connecting tunnels between the Eastern Expressway and the Western Expressway in Mumbai, India","datePublished":"2026-04-06T10:12:49+00:00","dateModified":"2026-04-23T12:37:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/"},"wordCount":628,"commentCount":0,"publisher":{"@id":"https:\/\/www.typsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/#primaryimage"},"thumbnailUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_26.jpg","articleSection":["Current News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/","url":"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/","name":"Connecting tunnels between the Eastern Expressway and the Western Expressway in Mumbai, India - Grupo TYPSA","isPartOf":{"@id":"https:\/\/www.typsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/#primaryimage"},"image":{"@id":"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/#primaryimage"},"thumbnailUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_26.jpg","datePublished":"2026-04-06T10:12:49+00:00","dateModified":"2026-04-23T12:37:05+00:00","breadcrumb":{"@id":"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/#primaryimage","url":"https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_26.jpg","contentUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/AUTOPISTA_INDIA_26.jpg","width":1024,"height":539},{"@type":"BreadcrumbList","@id":"https:\/\/www.typsa.com\/en\/connecting-tunnels-between-the-eastern-expressway-and-the-western-expressway-in-mumbai-india\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.typsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"Connecting tunnels between the Eastern Expressway and the Western Expressway in Mumbai, India"}]},{"@type":"WebSite","@id":"https:\/\/www.typsa.com\/en\/#website","url":"https:\/\/www.typsa.com\/en\/","name":"Grupo TYPSA","description":"Grupo TYPSA","publisher":{"@id":"https:\/\/www.typsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.typsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.typsa.com\/en\/#organization","name":"Grupo TYPSA","url":"https:\/\/www.typsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png","contentUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png","width":300,"height":300,"caption":"Grupo TYPSA"},"image":{"@id":"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3","name":"Cristina Ezquerra Boado","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776931717","url":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776931717","contentUrl":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776931717","caption":"Cristina Ezquerra Boado"},"url":"https:\/\/www.typsa.com\/en\/author\/ceb\/"}]}},"_links":{"self":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/81967","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/comments?post=81967"}],"version-history":[{"count":1,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/81967\/revisions"}],"predecessor-version":[{"id":81969,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/81967\/revisions\/81969"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/media\/81961"}],"wp:attachment":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/media?parent=81967"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/categories?post=81967"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/tags?post=81967"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}