{"id":81588,"date":"2026-02-09T10:26:09","date_gmt":"2026-02-09T09:26:09","guid":{"rendered":"https:\/\/www.typsa.com\/?p=81588"},"modified":"2026-03-06T11:09:35","modified_gmt":"2026-03-06T10:09:35","slug":"underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro","status":"publish","type":"post","link":"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/","title":{"rendered":"Underground pedestrian connection between the Alicante and X\u00e0tiva stations of the Valencia metro"},"content":{"rendered":"<p><span class=\"TextRun SCXW166556503 BCX0\" lang=\"EN-GB\" xml:lang=\"EN-GB\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW166556503 BCX0\" data-ccp-parastyle=\"Vi\u00f1eta TYPSA\" data-ccp-parastyle-defn=\"{&quot;ObjectId&quot;:&quot;17c8098e-2837-5f27-982c-7deb39921796|1&quot;,&quot;ClassId&quot;:1073872969,&quot;Properties&quot;:[201342446,&quot;1&quot;,201342447,&quot;5&quot;,201342448,&quot;1&quot;,201342449,&quot;1&quot;,469777841,&quot;Kalinga&quot;,469777842,&quot;&quot;,469777843,&quot;Kalinga&quot;,469777844,&quot;Kalinga&quot;,201341986,&quot;1&quot;,469769226,&quot;Kalinga&quot;,268442635,&quot;19&quot;,469775450,&quot;Vi\u00f1eta TYPSA&quot;,201340122,&quot;2&quot;,134234082,&quot;true&quot;,134233614,&quot;true&quot;,469778129,&quot;VietaTYPSA&quot;,335572020,&quot;1&quot;,335559685,&quot;568&quot;,335559991,&quot;284&quot;,335559682,&quot;2&quot;,335559683,&quot;0&quot;,134233279,&quot;true&quot;,469778324,&quot;Normal&quot;,469777804,&quot;\uf0a7&quot;,469777803,&quot;left&quot;,469777815,&quot;hybridMultilevel&quot;,469769242,&quot;9642&quot;,536884268,&quot;{17c8098e-2837-5f27-982c-7deb39921796}{1}&quot;]}\">December 2025\u00a0<\/span><span class=\"NormalTextRun SCXW166556503 BCX0\" data-ccp-parastyle=\"Vi\u00f1eta TYPSA\">saw the inauguration of\u00a0<\/span><span class=\"NormalTextRun SCXW166556503 BCX0\" data-ccp-parastyle=\"Vi\u00f1eta TYPSA\">the underground pedestrian connection between the Alacant and\u00a0<\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW166556503 BCX0\" data-ccp-parastyle=\"Vi\u00f1eta TYPSA\">X\u00e0tiva<\/span><span class=\"NormalTextRun SCXW166556503 BCX0\" data-ccp-parastyle=\"Vi\u00f1eta TYPSA\">\u00a0stations\u00a0<\/span><span class=\"NormalTextRun SCXW166556503 BCX0\" data-ccp-parastyle=\"Vi\u00f1eta TYPSA\">of the Valencia Metro,\u00a0<\/span><span class=\"NormalTextRun SCXW166556503 BCX0\" data-ccp-parastyle=\"Vi\u00f1eta TYPSA\">owned by\u00a0<\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW166556503 BCX0\" data-ccp-parastyle=\"Vi\u00f1eta TYPSA\">Ferrocarrils<\/span><span class=\"NormalTextRun SCXW166556503 BCX0\" data-ccp-parastyle=\"Vi\u00f1eta TYPSA\">\u00a0de la Generalitat Valenciana. The tunnel is 260 m long and 7.40 m wide, connecting pedestrian traffic between the two stations and improving connectivity within the Valencia metro network, functioning as an interchange\u00a0<\/span><span class=\"NormalTextRun SCXW166556503 BCX0\" data-ccp-parastyle=\"Vi\u00f1eta TYPSA\">between the lines that converge at both\u00a0<\/span><span class=\"NormalTextRun SCXW166556503 BCX0\" data-ccp-parastyle=\"Vi\u00f1eta TYPSA\">stations.<\/span><\/span><span class=\"EOP Selected SCXW166556503 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559685&quot;:568,&quot;335559739&quot;:120,&quot;335559740&quot;:240,&quot;335559991&quot;:284}\">\u00a0<\/span><\/p>\n<p style=\"text-align: center;\"><span class=\"TextRun SCXW61060171 BCX0\" lang=\"EN-GB\" xml:lang=\"EN-GB\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW61060171 BCX0\" data-ccp-parastyle=\"Vi\u00f1eta TYPSA\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-medium wp-image-81563 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-1-800x419.jpg\" alt=\"\" width=\"800\" height=\"419\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-1-800x419.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-1-1024x536.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-1-768x402.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-1.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/span><\/span><span class=\"TextRun SCXW61060171 BCX0\" lang=\"EN-GB\" xml:lang=\"EN-GB\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW61060171 BCX0\" data-ccp-parastyle=\"Vi\u00f1eta TYPSA\">Location of the connection between stations<\/span><\/span><\/p>\n<p><span data-contrast=\"auto\">TYPSA\u00a0participated\u00a0in\u00a0the drafting\u00a0of the\u00a0detailed design\u00a0and\u00a0in\u00a0the\u00a0construction\u00a0management for this connection, which\u00a0took\u00a0more than seven years to\u00a0complete.\u00a0The tunnel was built using the cut-and-cover method, with excavation\u00a0protected\u00a0by reinforced concrete walls and closed by concrete slabs. Its interior houses both the pedestrian passageway and the facilities necessary for its proper functioning, including ventilation, communications, fire protection, accessibility, lighting, and smoke extraction equipment for the connected railway lines.\u00a0Materials and finishes\u00a0were\u00a0chosen that are already commonly used in underground stations and buildings with similar characteristics, with\u00a0proven\u00a0suitability,\u00a0functionality\u00a0and easy maintenance, due to\u00a0their\u00a0anti-vandalism, durability and\u00a0easy\u00a0cleaning and replacement\u00a0characteristics.\u00a0The cladding is conceived as a transitional architectural feature, intended to emphasise spatial continuity and the connection with the station concourses. Similarly, the flooring and ceilings\u00a0were\u00a0designed using precise geometric modulation and orientation, designed to\u00a0accompany\u00a0and reinforce the directionality of the pedestrian route, emphasising its linear character.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The potential monotony inherent in this type of infrastructure is neutralised by the incorporation of large light wells, which act as spatial landmarks and reference points along the route. These devices introduce colour and\u00a0establish\u00a0a visual relationship with the exterior, incorporating carefully selected panoramic views of the urban and\u00a0regional\u00a0landscape of Valencia.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The views are arranged according to the direction of the user, constructing a perceptual sequence linked to movement: towards the city centre, landmarks such as Valencia Cathedral, the Central Market or the Serranos Towers,\u00a0evoking\u00a0the iconic\u00a0<\/span><i><span data-contrast=\"auto\">Luna de\u00a0Val\u00e8ncia<\/span><\/i><span data-contrast=\"auto\">, and\u00a0towards the sea, contemporary and landscape landmarks such as the City of Arts and Sciences, the Turia Gardens,\u00a0Malvarrosa\u00a0beach and the\u00a0Albufera\u00a0Natural Park at sunset. In this way, the route transcends its functional condition to become an oriented spatial experience, in which architecture acts as a mediator between infrastructure and urban identity, inviting travellers to discover the city and project themselves towards it.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The\u00a0work encompassed\u00a0the redevelopment of the exterior of the\u00a0Plaza de Toros\u00a0(bullring), which in 1983 was declared\u00a0a national monument and site of cultural interest\u00a0in Valencia&#8217;s current general plan, dating from 1988.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">This redevelopment has a marked representative character due to its location in the heart of the city, as well as being the antechamber to\u00a0the bullring, which is why\u00a0the design adopted for the repaving respects the original idea and layout based on circles and concentric lines directly related to the circular shape of the\u00a0bullring, which enhances the monumentality of the building.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p style=\"text-align: center;\"><img decoding=\"async\" class=\"size-medium wp-image-81565 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-2-800x325.jpg\" alt=\"\" width=\"800\" height=\"325\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-2-800x325.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-2-1024x416.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-2-768x312.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-2.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><span class=\"TextRun SCXW177451096 BCX0\" lang=\"EN-GB\" xml:lang=\"EN-GB\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW177451096 BCX0\">Construction of the pedestrian connection between stations<\/span><\/span><\/p>\n<p><span class=\"TextRun SCXW178415959 BCX0\" lang=\"EN-GB\" xml:lang=\"EN-GB\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW178415959 BCX0\">The design of the tunnel\u00a0<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">w<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">as developed to respond to two\u00a0<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">previously defined\u00a0<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">main scenarios: the current situation, characterised by the existence of a pedestrian connection between the station concourses, and the future situation<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">,\u00a0<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">in which the continuation of line 10 on double track from Alacant station to the city centre is planned.\u00a0<\/span><span class=\"NormalTextRun AdvancedProofingIssueV2Themed SCXW178415959 BCX0\">In order to<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">\u00a0guarantee the functionality of the metro network in both\u00a0<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">scenarios, the infrastructure\u00a0<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">w<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">as designed and executed\u00a0<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">considering<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">\u00a0the specific constraints of each one. This approach involved\u00a0<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">numerous<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">\u00a0challenges in both the design and construction phases, for which\u00a0<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">appropriate technical<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">\u00a0solutions\u00a0<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">were\u00a0<\/span><span class=\"NormalTextRun SCXW178415959 BCX0\">adopted.<\/span><\/span><span class=\"EOP SCXW178415959 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p style=\"text-align: center;\"><img decoding=\"async\" class=\"size-medium wp-image-81567 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-3-800x239.jpg\" alt=\"\" width=\"800\" height=\"239\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-3-800x239.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-3-1024x306.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-3-768x230.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-3.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><span class=\"NormalTextRun SCXW57692828 BCX0\">BIM model of structures and architecture, showing the depth of the screens and the <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW57692828 BCX0\">micropile<\/span><span class=\"NormalTextRun SCXW57692828 BCX0\">\u00a0screen installed as\u00a0<\/span><span class=\"NormalTextRun SCXW57692828 BCX0\">additional<\/span><span class=\"NormalTextRun SCXW57692828 BCX0\">\u00a0protection for the Plaza de Toros<\/span><\/p>\n<p><span data-contrast=\"auto\">For example, the\u00a0concrete\u00a0screens\u00a0were\u00a0extended to the depth of the lower level of train traffic, their location on the ground plan respecting\u00a0the future\u00a0layout,\u00a0and their calculation respecting\u00a0the need for no intermediate levels of shoring\u00a0for either the pedestrian tunnel or future rail traffic.\u00a0Similarly, the resistant slab supports that can be removed\u00a0later\u00a0were\u00a0omitted. Finally, fusible construction elements\u00a0were\u00a0used,\u00a0designed for easy demolition in future change of use projects. In short, a project\u00a0was designed and built\u00a0to\u00a0minimise the impact on neighbours, users\u00a0of the facilities, property owners,\u00a0designers\u00a0and construction companies involved in the\u00a0subsequent\u00a0change of use.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">During\u00a0the design and construction of the connection,\u00a0a number of\u00a0external constraints were resolved, including:<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<ul>\n<li aria-setsize=\"-1\" data-leveltext=\"\uf02d\" data-font=\"Symbol\" data-listid=\"7\" data-list-defn-props=\"{&quot;335552541&quot;:1,&quot;335559685&quot;:360,&quot;335559991&quot;:360,&quot;469769226&quot;:&quot;Symbol&quot;,&quot;469769242&quot;:[8226],&quot;469777803&quot;:&quot;left&quot;,&quot;469777804&quot;:&quot;\uf02d&quot;,&quot;469777815&quot;:&quot;hybridMultilevel&quot;}\" data-aria-posinset=\"1\" data-aria-level=\"1\"><span data-contrast=\"auto\">the presence of two\u00a0cultural heritage sites\u00a0(&lt; 2 m)\u00a0close to the route of the connection,\u00a0namely\u00a0the Estaci\u00f3n del Norte railway station and the Plaza de Toros bullring\u00a0in the city of Valencia.\u00a0To\u00a0reduce\u00a0the potential impact on these buildings, the maximum permissible ground deformations on the outer face of the walls\u00a0were\u00a0limited, excavation methods that minimise deformations in the screens used, and passive protection with\u00a0micropile\u00a0screens installed in\u00a0critical sections. The suitability of the designs and construction procedures\u00a0were\u00a0verified by a real-time monitoring campaign that controlled deformations in the ground and nearby buildings, as well as the condition of the slabs and structural walls.<\/span><span data-ccp-props=\"{&quot;134233279&quot;:false,&quot;201341983&quot;:0,&quot;335559685&quot;:357,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/li>\n<\/ul>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-81569 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-4-800x585.jpg\" alt=\"\" width=\"800\" height=\"585\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-4-800x585.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-4-1024x748.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-4-768x561.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-4.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><span class=\"TextRun SCXW126248763 BCX0\" lang=\"EN-GB\" xml:lang=\"EN-GB\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW126248763 BCX0\">Installation of screens between protected buildings<\/span><\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\">the existence of\u00a0numerous\u00a0pre-existing services\u00a0that\u00a0had to be diverted.\u00a0The replacement of large-diameter sewage collectors (\u00d8 2000), water supply trunk pipes (\u00d8 600), main communication lines,\u00a0gas\u00a0and even historic irrigation ditches, such as the\u00a0Rovella ditch,\u00a0was\u00a0coordinated. Many of the affected service companies took\u00a0advantage of\u00a0the replacement\u00a0to modernise their facilities, and the work\u00a0was coordinated with other nearby works and with events scheduled in the vicinity, such as\u00a0performances in\u00a0the\u00a0Plaza de Toros, work restrictions due to crowds during\u00a0local\u00a0Fallas\u00a0celebrations, etc.<\/span><span data-ccp-props=\"{&quot;134233279&quot;:false,&quot;201341983&quot;:0,&quot;335559685&quot;:357,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">The decision to provide a dual pedestrian-tram connection, which\u00a0was taken once the works had begun and part of the infrastructure had been built, required additional effort to redesign the work with significant geometric and functional restrictions, and required the reinforcement of part of what had already been built, all without slowing down\u00a0the pace of the works.<\/span><span data-ccp-props=\"{&quot;134233279&quot;:false,&quot;201341983&quot;:0,&quot;335559685&quot;:357,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><b><span data-contrast=\"auto\">Facilities<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The pedestrian tunnel facilities between Alicante and\u00a0X\u00e0tiva\u00a0stations\u00a0were\u00a0another of the most technically complex elements of the project,\u00a0due to\u00a0their length and because of their integration into a railway and urban environment in service, with a high density of pre-existing infrastructure.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The design and execution of the installations was carried out guaranteeing the safety, functionality,\u00a0accessibility\u00a0and comfort of users,\u00a0complying at all times\u00a0with the applicable regulations and technical criteria of\u00a0Ferrocarrils\u00a0de la Generalitat Valenciana, as well as with the requirements derived from railway operations.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-81571 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-5-800x451.jpg\" alt=\"\" width=\"800\" height=\"451\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-5-800x451.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-5-1024x578.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-5-768x433.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-5.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><span data-contrast=\"none\">BIM model of the facilities constructed to provide services to the pedestrian tunnel<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:2,&quot;335551620&quot;:2,&quot;335557856&quot;:14478060,&quot;335559738&quot;:60,&quot;335559739&quot;:60,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Drainage and sanitation<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The drainage system for the pedestrian tunnel\u00a0was designed to ensure the effective evacuation of rainwater and infiltrations, both inside the tunnel and in the areas connecting to the stations and the external urbanisation.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-81573 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-6-800x451.jpg\" alt=\"\" width=\"800\" height=\"451\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-6-800x451.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-6-1024x578.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-6-768x433.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-6.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><span data-contrast=\"none\">Concrete pouring phase of the section above the upper slab of the diverted Ronda Collector Tunnel<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:2,&quot;335551620&quot;:2,&quot;335557856&quot;:14478060,&quot;335559738&quot;:60,&quot;335559739&quot;:60,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The system includes longitudinal gutters, drains and downpipes connected to a pumping system, with a repumping well\u00a0located\u00a0near the junction with the\u00a0X\u00e0tiva\u00a0station. From this point, the water is pumped to the general surface drainage network via a connection pipe specifically designed for this purpose.<\/span><br \/>\n<span data-contrast=\"auto\">Likewise, the drainage systems in the urbanised areas of Calle\u00a0Alacant, the bullring and its surroundings\u00a0were\u00a0adapted and replaced, ensuring proper integration with the existing municipal network.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Electrical installations<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The electrical installations include both the low-voltage power supply and the necessary conduits for\u00a0the\u00a0medium-voltage line\u00a0diversions,\u00a0eight in total, guaranteeing the supply to all the systems in the tunnel\u00a0and\u00a0the connected stations, as well as\u00a0to\u00a0general-purpose services.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Distribution networks\u00a0were\u00a0installed using metal trays and specific conduits, with functional separation between power, lighting,\u00a0communications\u00a0and security systems circuits. The cables used are copper, low smoke emission and halogen-free, suitable for installation in underground public infrastructure.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The lighting system\u00a0was implemented using high-efficiency LED luminaires, providing light levels\u00a0in accordance with\u00a0current regulations and reinforced by self-contained emergency lighting, powered by backup systems.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Ventilation and environmental control<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The pedestrian tunnel has a ventilation system designed to ensure adequate health and comfort conditions during normal operation, as well as to facilitate smoke extraction in emergency situations.<\/span><br \/>\n<span data-contrast=\"auto\">The system is integrated with the station ventilation installations, including ducts, dampers and control elements, and has been dimensioned\u00a0considering\u00a0the different operating scenarios envisaged in the project and its subsequent modifications.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-81575 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-7-800x451.jpg\" alt=\"\" width=\"800\" height=\"451\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-7-800x451.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-7-1024x578.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-7-768x433.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-7.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><span class=\"TextRun SCXW217772397 BCX0\" lang=\"EN-GB\" xml:lang=\"EN-GB\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW217772397 BCX0\">Two of the four fans installed in technical lofts for air renewal in the tunnel<\/span><\/span><span class=\"EOP SCXW217772397 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:2,&quot;335551620&quot;:2,&quot;335557856&quot;:14478060,&quot;335559738&quot;:60,&quot;335559739&quot;:60,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Fire protection<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Fire protection\u00a0was\u00a0covered\u00a0through a set of active and passive installations that enable detection,\u00a0control\u00a0and safe evacuation of users.\u00a0Among other elements, these include detection and signalling systems, compartmentalisation using automatic smoke control curtains, active protection\u00a0installations\u00a0and their integration with the general station systems\u00a0( ). All of this\u00a0was designed\u00a0in accordance with\u00a0current regulations and the specific criteria applicable to underground railway infrastructure.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-81577 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-8-800x451.jpg\" alt=\"\" width=\"800\" height=\"451\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-8-800x451.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-8-1024x578.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-8-768x433.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-8.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><span class=\"NormalTextRun SCXW231447268 BCX0\">New pressure unit for the fire hydrants installed along the <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW231447268 BCX0\">Ca\u00f1\u00f3n<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Communications and special systems<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\" data-contrast=\"auto\">The replacement of the communication installations affected by the work\u00a0required intensive coordination with the existing service companies, given the presence of multiple telecommunications networks\u00a0in the area of\u00a0operation. During the execution of the works, various fibre optic cables and\u00a0conduits\u00a0were\u00a0identified, protected,\u00a0diverted\u00a0or replaced, ensuring the continuity of the affected services at all times.<\/span><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-81579 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-9-800x451.jpg\" alt=\"\" width=\"800\" height=\"451\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-9-800x451.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-9-1024x578.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-9-768x433.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-9.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><span class=\"TextRun SCXW162205455 BCX0\" lang=\"EN-GB\" xml:lang=\"EN-GB\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW162205455 BCX0\">Protection, control and communications panels in the technical room on the X\u00e0tiva side<\/span><\/span><span class=\"EOP SCXW162205455 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The final result\u00a0integrates the new tunnel facilities with the existing railway and urban communications networks, without interfering with operations.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Vertical transport systems<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">To ensure universal accessibility and\u00a0facilitate\u00a0user mobility between the\u00a0different levels\u00a0of the pedestrian tunnel and\u00a0X\u00e0tiva\u00a0station, a lift and an escalator\u00a0were\u00a0installed\u00a0in accordance with\u00a0regulations.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The lift installed is electric with traction machinery, equipped with automatic rescue systems\u00a0in the event of\u00a0power failures and two-way communication with the control centre. The cabin\u00a0complies with\u00a0universal accessibility requirements, including visual and audible signage, Braille\u00a0buttons\u00a0and dimensions suitable for users with reduced mobility.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The escalator has active safety systems, including obstacle detection, emergency stop and soft start, ensuring comfort and safety under normal operating conditions. Both the lift and the escalator are integrated into the general infrastructure control and maintenance system, allowing continuous monitoring and control from the\u00a0control room\u00a0and efficient incident management.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p style=\"text-align: center;\"><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-81581 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-10-800x451.jpg\" alt=\"\" width=\"800\" height=\"451\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-10-800x451.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-10-1024x578.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-10-768x433.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-10.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><span class=\"TextRun SCXW59800076 BCX0\" lang=\"EN-GB\" xml:lang=\"EN-GB\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW59800076 BCX0\">Final stages of commissioning and adjustments to the escalator and lift connecting X\u00e0tiva and Ca\u00f1\u00f3n<\/span><\/span><span class=\"EOP SCXW59800076 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:2,&quot;335551620&quot;:2,&quot;335557856&quot;:14478060,&quot;335559738&quot;:60,&quot;335559739&quot;:60,&quot;335559740&quot;:240}\">\u00a0<\/span><\/span><\/p>\n<p><b><span data-contrast=\"auto\">Integration and commissioning<\/span><\/b><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">All the installations\u00a0were\u00a0integrated in a coordinated manner with the civil works and architectural finishes,\u00a0being concealed or integrated into false ceilings, cladding and technical rooms, facilitating their maintenance and operation.<\/span><br \/>\n<span data-contrast=\"auto\">Prior to the commissioning of the pedestrian tunnel, the necessary checks and verifications were carried out to ensure the correct functioning of the various systems, culminating in its\u00a0commissioning\u00a0in safe and reliable conditions.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The works were inaugurated\u00a0in\u00a0December 2025\u00a0by the President of the\u00a0Valencian\u00a0Regional Government,\u00a0Juan Francisco P\u00e9rez Llorca.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335559739&quot;:120,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-81583 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-11-800x451.jpg\" alt=\"\" width=\"800\" height=\"451\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-11-800x451.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-11-1024x578.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-11-768x433.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26-11.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><span class=\"TextRun SCXW189688961 BCX0\" lang=\"EN-GB\" xml:lang=\"EN-GB\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW189688961 BCX0\">Inauguration of the pedestrian connection between Alacant and <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW189688961 BCX0\">X\u00e0tiva<\/span><span class=\"NormalTextRun SCXW189688961 BCX0\">\u00a0stations.\u00a0<\/span><\/span><span class=\"TextRun SCXW189688961 BCX0\" lang=\"ES-ES\" xml:lang=\"ES-ES\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW189688961 BCX0\">Valencia Metro<\/span><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>December 2025\u00a0saw the inauguration of\u00a0the underground pedestrian connection between the Alacant and\u00a0X\u00e0tiva\u00a0stations\u00a0of the Valencia Metro,\u00a0owned by\u00a0Ferrocarrils\u00a0de la Generalitat Valenciana. The tunnel is 260 m long and 7.40 m wide, connecting pedestrian traffic between the two stations and improving connectivity within the Valencia metro network, functioning as an interchange\u00a0between the lines that converge at both\u00a0stations.\u00a0 Location &#8230; <a title=\"Underground pedestrian connection between the Alicante and X\u00e0tiva stations of the Valencia metro\" class=\"read-more\" href=\"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/\" aria-label=\"Read more about Underground pedestrian connection between the Alicante and X\u00e0tiva stations of the Valencia metro\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":81585,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[440],"tags":[],"class_list":["post-81588","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-current-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Underground pedestrian connection between the Alicante and X\u00e0tiva stations of the Valencia metro - Grupo TYPSA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Underground pedestrian connection between the Alicante and X\u00e0tiva stations of the Valencia metro - Grupo TYPSA\" \/>\n<meta property=\"og:description\" content=\"December 2025\u00a0saw the inauguration of\u00a0the underground pedestrian connection between the Alacant and\u00a0X\u00e0tiva\u00a0stations\u00a0of the Valencia Metro,\u00a0owned by\u00a0Ferrocarrils\u00a0de la Generalitat Valenciana. The tunnel is 260 m long and 7.40 m wide, connecting pedestrian traffic between the two stations and improving connectivity within the Valencia metro network, functioning as an interchange\u00a0between the lines that converge at both\u00a0stations.\u00a0 Location ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/\" \/>\n<meta property=\"og:site_name\" content=\"Grupo TYPSA\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-09T09:26:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-06T10:09:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"539\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cristina Ezquerra Boado\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Cristina Ezquerra Boado\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\\\/\"},\"author\":{\"name\":\"Cristina Ezquerra Boado\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/person\\\/4b798f83d9c8c4ea1c0fb471926d3aa3\"},\"headline\":\"Underground pedestrian connection between the Alicante and X\u00e0tiva stations of the Valencia metro\",\"datePublished\":\"2026-02-09T09:26:09+00:00\",\"dateModified\":\"2026-03-06T10:09:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\\\/\"},\"wordCount\":1864,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/Metro_Valencia26.jpg\",\"articleSection\":[\"Current News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.typsa.com\\\/en\\\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\\\/\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\\\/\",\"name\":\"Underground pedestrian connection between the Alicante and X\u00e0tiva stations of the Valencia metro - Grupo TYPSA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/Metro_Valencia26.jpg\",\"datePublished\":\"2026-02-09T09:26:09+00:00\",\"dateModified\":\"2026-03-06T10:09:35+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.typsa.com\\\/en\\\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/Metro_Valencia26.jpg\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/Metro_Valencia26.jpg\",\"width\":1024,\"height\":539},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Underground pedestrian connection between the Alicante and X\u00e0tiva stations of the Valencia metro\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\",\"name\":\"Grupo TYPSA\",\"description\":\"Grupo TYPSA\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\",\"name\":\"Grupo TYPSA\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/logo-grupo-Typsa-300x300-1.png\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/logo-grupo-Typsa-300x300-1.png\",\"width\":300,\"height\":300,\"caption\":\"Grupo TYPSA\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/person\\\/4b798f83d9c8c4ea1c0fb471926d3aa3\",\"name\":\"Cristina Ezquerra Boado\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776326669\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776326669\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776326669\",\"caption\":\"Cristina Ezquerra Boado\"},\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/author\\\/ceb\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Underground pedestrian connection between the Alicante and X\u00e0tiva stations of the Valencia metro - Grupo TYPSA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/","og_locale":"en_US","og_type":"article","og_title":"Underground pedestrian connection between the Alicante and X\u00e0tiva stations of the Valencia metro - Grupo TYPSA","og_description":"December 2025\u00a0saw the inauguration of\u00a0the underground pedestrian connection between the Alacant and\u00a0X\u00e0tiva\u00a0stations\u00a0of the Valencia Metro,\u00a0owned by\u00a0Ferrocarrils\u00a0de la Generalitat Valenciana. The tunnel is 260 m long and 7.40 m wide, connecting pedestrian traffic between the two stations and improving connectivity within the Valencia metro network, functioning as an interchange\u00a0between the lines that converge at both\u00a0stations.\u00a0 Location ... Read more","og_url":"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/","og_site_name":"Grupo TYPSA","article_published_time":"2026-02-09T09:26:09+00:00","article_modified_time":"2026-03-06T10:09:35+00:00","og_image":[{"width":1024,"height":539,"url":"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26.jpg","type":"image\/jpeg"}],"author":"Cristina Ezquerra Boado","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Cristina Ezquerra Boado","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/#article","isPartOf":{"@id":"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/"},"author":{"name":"Cristina Ezquerra Boado","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3"},"headline":"Underground pedestrian connection between the Alicante and X\u00e0tiva stations of the Valencia metro","datePublished":"2026-02-09T09:26:09+00:00","dateModified":"2026-03-06T10:09:35+00:00","mainEntityOfPage":{"@id":"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/"},"wordCount":1864,"commentCount":0,"publisher":{"@id":"https:\/\/www.typsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/#primaryimage"},"thumbnailUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26.jpg","articleSection":["Current News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/","url":"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/","name":"Underground pedestrian connection between the Alicante and X\u00e0tiva stations of the Valencia metro - Grupo TYPSA","isPartOf":{"@id":"https:\/\/www.typsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/#primaryimage"},"image":{"@id":"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/#primaryimage"},"thumbnailUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26.jpg","datePublished":"2026-02-09T09:26:09+00:00","dateModified":"2026-03-06T10:09:35+00:00","breadcrumb":{"@id":"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/#primaryimage","url":"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26.jpg","contentUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/Metro_Valencia26.jpg","width":1024,"height":539},{"@type":"BreadcrumbList","@id":"https:\/\/www.typsa.com\/en\/underground-pedestrian-connection-between-the-alicante-and-xativa-stations-of-the-valencia-metro\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.typsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"Underground pedestrian connection between the Alicante and X\u00e0tiva stations of the Valencia metro"}]},{"@type":"WebSite","@id":"https:\/\/www.typsa.com\/en\/#website","url":"https:\/\/www.typsa.com\/en\/","name":"Grupo TYPSA","description":"Grupo TYPSA","publisher":{"@id":"https:\/\/www.typsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.typsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.typsa.com\/en\/#organization","name":"Grupo TYPSA","url":"https:\/\/www.typsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png","contentUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png","width":300,"height":300,"caption":"Grupo TYPSA"},"image":{"@id":"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3","name":"Cristina Ezquerra Boado","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776326669","url":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776326669","contentUrl":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776326669","caption":"Cristina Ezquerra Boado"},"url":"https:\/\/www.typsa.com\/en\/author\/ceb\/"}]}},"_links":{"self":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/81588","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/comments?post=81588"}],"version-history":[{"count":1,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/81588\/revisions"}],"predecessor-version":[{"id":81589,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/81588\/revisions\/81589"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/media\/81585"}],"wp:attachment":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/media?parent=81588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/categories?post=81588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/tags?post=81588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}