{"id":80191,"date":"2025-08-29T10:50:19","date_gmt":"2025-08-29T09:50:19","guid":{"rendered":"https:\/\/www.typsa.com\/?p=80191"},"modified":"2025-09-10T10:53:27","modified_gmt":"2025-09-10T09:53:27","slug":"renovation-of-metrovalencia-infrastructure","status":"publish","type":"post","link":"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/","title":{"rendered":"Renovation of Metrovalencia infrastructure"},"content":{"rendered":"<p><span data-contrast=\"auto\">As part of the works for the renovation and expansion of Metrovalencia\u2019s network infrastructure, TYPSA, commissioned by Ferrocarrils de la Generalitat Valenciana, has carried out the design and construction supervision of the structural rehabilitation of 2.6 km of tunnel, drainage improvements, and track renewal in the Alameda\u2013Mar\u00edtim Serrer\u00eda section of Metro lines 5 and 7 in Valencia.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:120}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The infrastructure had severely deteriorated over time, largely due to water ingress, making it necessary to restore it to its original condition. During the summer of 2025, service was suspended for two months while the following works were carried out: hydrodemolition (by robot and by lance) of the affected surface, brushing and passivation of the reinforcement, application of sprayed mortar, joint treatment, and reinstatement of installations. The central duct of the tunnel was replaced with a larger-section duct, and deteriorated sleepers and rails were replaced.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:120}\">\u00a0<\/span><\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"size-medium wp-image-80189 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25B-800x431.jpg\" alt=\"\" width=\"800\" height=\"431\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25B-800x431.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25B-1024x551.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25B-768x413.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25B.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<p><span data-contrast=\"auto\">On Wednesday 27<\/span><span data-contrast=\"auto\">th<\/span><span data-contrast=\"auto\"> August, the Minister for Environment, Infrastructure and Territory, Vicente Mart\u00ednez Mus, and the General Manager of Ferrocarrils of the Generalitat Valenciana, Alfonso Novo Belenguer, visited the works prior to the resumption of rail services, scheduled for September 1st 2025.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:120}\">\u00a0<\/span><\/p>\n<h6 style=\"text-align: center;\"><img decoding=\"async\" class=\"size-medium wp-image-80187 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25A-800x431.jpg\" alt=\"\" width=\"800\" height=\"431\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25A-800x431.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25A-1024x551.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25A-768x413.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25A.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><span class=\"TextRun SCXW78490947 BCX0\" lang=\"EN-GB\" xml:lang=\"EN-GB\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW78490947 BCX0\">Visit by the Minister in the presence of Javier <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW78490947 BCX0\">Cordellat<\/span><span class=\"NormalTextRun SCXW78490947 BCX0\"> and Ignacio Ortolano and staff from the construction team.<\/span><\/span><span class=\"EOP SCXW78490947 BCX0\" data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:120}\">\u00a0<\/span><\/h6>\n","protected":false},"excerpt":{"rendered":"<p>As part of the works for the renovation and expansion of Metrovalencia\u2019s network infrastructure, TYPSA, commissioned by Ferrocarrils de la Generalitat Valenciana, has carried out the design and construction supervision of the structural rehabilitation of 2.6 km of tunnel, drainage improvements, and track renewal in the Alameda\u2013Mar\u00edtim Serrer\u00eda section of Metro lines 5 and 7 &#8230; <a title=\"Renovation of Metrovalencia infrastructure\" class=\"read-more\" href=\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/\" aria-label=\"Read more about Renovation of Metrovalencia infrastructure\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":80185,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[440],"tags":[],"class_list":["post-80191","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-current-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Renovation of Metrovalencia infrastructure - Grupo TYPSA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Renovation of Metrovalencia infrastructure - Grupo TYPSA\" \/>\n<meta property=\"og:description\" content=\"As part of the works for the renovation and expansion of Metrovalencia\u2019s network infrastructure, TYPSA, commissioned by Ferrocarrils de la Generalitat Valenciana, has carried out the design and construction supervision of the structural rehabilitation of 2.6 km of tunnel, drainage improvements, and track renewal in the Alameda\u2013Mar\u00edtim Serrer\u00eda section of Metro lines 5 and 7 ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/\" \/>\n<meta property=\"og:site_name\" content=\"Grupo TYPSA\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-29T09:50:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-10T09:53:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"539\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cristina Ezquerra Boado\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Cristina Ezquerra Boado\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/\"},\"author\":{\"name\":\"Cristina Ezquerra Boado\",\"@id\":\"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3\"},\"headline\":\"Renovation of Metrovalencia infrastructure\",\"datePublished\":\"2025-08-29T09:50:19+00:00\",\"dateModified\":\"2025-09-10T09:53:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/\"},\"wordCount\":207,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.typsa.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25.jpg\",\"articleSection\":[\"Current News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/\",\"url\":\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/\",\"name\":\"Renovation of Metrovalencia infrastructure - Grupo TYPSA\",\"isPartOf\":{\"@id\":\"https:\/\/www.typsa.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25.jpg\",\"datePublished\":\"2025-08-29T09:50:19+00:00\",\"dateModified\":\"2025-09-10T09:53:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#primaryimage\",\"url\":\"https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25.jpg\",\"contentUrl\":\"https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25.jpg\",\"width\":1024,\"height\":539},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.typsa.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Renovation of Metrovalencia infrastructure\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.typsa.com\/en\/#website\",\"url\":\"https:\/\/www.typsa.com\/en\/\",\"name\":\"Grupo TYPSA\",\"description\":\"Grupo TYPSA\",\"publisher\":{\"@id\":\"https:\/\/www.typsa.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.typsa.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.typsa.com\/en\/#organization\",\"name\":\"Grupo TYPSA\",\"url\":\"https:\/\/www.typsa.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png\",\"contentUrl\":\"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png\",\"width\":300,\"height\":300,\"caption\":\"Grupo TYPSA\"},\"image\":{\"@id\":\"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3\",\"name\":\"Cristina Ezquerra Boado\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1775116944\",\"url\":\"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1775116944\",\"contentUrl\":\"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1775116944\",\"caption\":\"Cristina Ezquerra Boado\"},\"url\":\"https:\/\/www.typsa.com\/en\/author\/ceb\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Renovation of Metrovalencia infrastructure - Grupo TYPSA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/","og_locale":"en_US","og_type":"article","og_title":"Renovation of Metrovalencia infrastructure - Grupo TYPSA","og_description":"As part of the works for the renovation and expansion of Metrovalencia\u2019s network infrastructure, TYPSA, commissioned by Ferrocarrils de la Generalitat Valenciana, has carried out the design and construction supervision of the structural rehabilitation of 2.6 km of tunnel, drainage improvements, and track renewal in the Alameda\u2013Mar\u00edtim Serrer\u00eda section of Metro lines 5 and 7 ... Read more","og_url":"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/","og_site_name":"Grupo TYPSA","article_published_time":"2025-08-29T09:50:19+00:00","article_modified_time":"2025-09-10T09:53:27+00:00","og_image":[{"width":1024,"height":539,"url":"https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25.jpg","type":"image\/jpeg"}],"author":"Cristina Ezquerra Boado","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Cristina Ezquerra Boado","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#article","isPartOf":{"@id":"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/"},"author":{"name":"Cristina Ezquerra Boado","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3"},"headline":"Renovation of Metrovalencia infrastructure","datePublished":"2025-08-29T09:50:19+00:00","dateModified":"2025-09-10T09:53:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/"},"wordCount":207,"commentCount":0,"publisher":{"@id":"https:\/\/www.typsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#primaryimage"},"thumbnailUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25.jpg","articleSection":["Current News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/","url":"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/","name":"Renovation of Metrovalencia infrastructure - Grupo TYPSA","isPartOf":{"@id":"https:\/\/www.typsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#primaryimage"},"image":{"@id":"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#primaryimage"},"thumbnailUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25.jpg","datePublished":"2025-08-29T09:50:19+00:00","dateModified":"2025-09-10T09:53:27+00:00","breadcrumb":{"@id":"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#primaryimage","url":"https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25.jpg","contentUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/METRO_VALENCIA25.jpg","width":1024,"height":539},{"@type":"BreadcrumbList","@id":"https:\/\/www.typsa.com\/en\/renovation-of-metrovalencia-infrastructure\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.typsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"Renovation of Metrovalencia infrastructure"}]},{"@type":"WebSite","@id":"https:\/\/www.typsa.com\/en\/#website","url":"https:\/\/www.typsa.com\/en\/","name":"Grupo TYPSA","description":"Grupo TYPSA","publisher":{"@id":"https:\/\/www.typsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.typsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.typsa.com\/en\/#organization","name":"Grupo TYPSA","url":"https:\/\/www.typsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png","contentUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png","width":300,"height":300,"caption":"Grupo TYPSA"},"image":{"@id":"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3","name":"Cristina Ezquerra Boado","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1775116944","url":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1775116944","contentUrl":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1775116944","caption":"Cristina Ezquerra Boado"},"url":"https:\/\/www.typsa.com\/en\/author\/ceb\/"}]}},"_links":{"self":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/80191","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/comments?post=80191"}],"version-history":[{"count":1,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/80191\/revisions"}],"predecessor-version":[{"id":80192,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/80191\/revisions\/80192"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/media\/80185"}],"wp:attachment":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/media?parent=80191"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/categories?post=80191"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/tags?post=80191"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}