{"id":79247,"date":"2025-01-09T17:34:28","date_gmt":"2025-01-09T16:34:28","guid":{"rendered":"https:\/\/www.typsa.com\/?p=79247"},"modified":"2025-03-13T11:56:51","modified_gmt":"2025-03-13T10:56:51","slug":"feasibility-study-of-the-antequera-granada-almeria-railway-connection","status":"publish","type":"post","link":"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/","title":{"rendered":"Feasibility study of the Antequera-Granada-Almer\u00eda railway connection"},"content":{"rendered":"<p>The Ministry of Transport and Sustainable Mobility has commissioned the joint venture EI Antequera-Granada-Almer\u00eda, led by TYPSA, with the contract to carry out a feasibility study and three informative studies with which to provide a comprehensive response to railway connectivity between Antequera, Granada and Almer\u00eda.<\/p>\n<p>In this study, the itinerary will be analysed with the aim of improving the functionality of the section, both for passenger and freight traffic, so as to establish a homogeneous standard gauge railway line between the three cities. The section will continue the Mediterranean Corridor, allowing the connection, through Murcia, with the rest of the corridor.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-79266 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_1-800x518.jpg\" alt=\"\" width=\"560\" height=\"362\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_1-800x518.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_1-768x497.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_1.jpg 1010w\" sizes=\"(max-width: 560px) 100vw, 560px\" \/><\/p>\n<p>The Antequera-Granada-Almer\u00eda line does not currently have a homogeneous configuration, since, between Antequera and Granada, some sections consist of a double track with standard gauge, other single-track sections of standard gauge and two sections (Loja and entrance to Granada) have a single track and a third lane (standard gauge and Iberian gauge on the same route). Furthermore, between Granada and Almer\u00eda, the current configuration is a single track in Iberian gauge.<\/p>\n<h6 style=\"text-align: center;\"><img decoding=\"async\" class=\"wp-image-79270 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_3-800x421.jpg\" alt=\"\" width=\"555\" height=\"292\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_3-800x421.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_3-1024x538.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_3-768x404.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_3.jpg 1168w\" sizes=\"(max-width: 555px) 100vw, 555px\" \/>Current situation<\/h6>\n<p>For this reason, the actions that will be carried out along the section have been divided into three independent informative studies, one for each of the subsections identified: section 1: Antequera-Granada, section 2: Granada arterial railway network, and section 3: Granada-Almer\u00eda.<\/p>\n<p>The feasibility study and the informative studies encompass two fundamental works to integrate the section into the Mediterranean Corridor, which must be coordinated with each other.<\/p>\n<h6 style=\"text-align: center;\"><img decoding=\"async\" class=\"wp-image-79272 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_4-800x421.jpg\" alt=\"\" width=\"572\" height=\"301\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_4-800x421.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_4-1024x538.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_4-768x404.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_4.jpg 1168w\" sizes=\"(max-width: 572px) 100vw, 572px\" \/>Current planned situation<\/h6>\n<p>On the one hand, there is the definition of the actions already outlined in the functional study of the Granada-Almer\u00eda section to connect both Andalusian capitals in standard European gauge, through which the joint section will be integrated into the Mediterranean Corridor. This reduces travel times between Almer\u00eda and Granada, making them more competitive, and making it possible to connect Almer\u00eda and Seville in less than three and a half hours by rail, thanks to other actions that are being carried out in parallel. All of this must be carried out in a manner compatible with the works planned by Adif in the drafting of the renovation projects for the Granada-Almer\u00eda section.<\/p>\n<p>On the other hand, the actions necessary to allow freight trains to pass through Granada and along the Granada-Antequera section will be analysed, guaranteeing the circulation of this type of train between Antequera and Almer\u00eda and its continuity with the Mediterranean Corridor. The possible solutions that will be analysed in this informative study include the Moreda bypass in Granada.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-79268 aligncenter\" src=\"https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_2-800x341.jpg\" alt=\"\" width=\"800\" height=\"341\" srcset=\"https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_2-800x341.jpg 800w, https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_2-1024x437.jpg 1024w, https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_2-768x328.jpg 768w, https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA_2.jpg 1200w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/p>\n<p>The contract has an execution period of 36 months, including public information work, environmental processing, etc., which must be carried out until the final approval of the informative studies.<\/p>\n<p>In accordance with the law on the railway sector, within the framework of this service contract, a unique feasibility study will be carried out that will analyse all three sections and will provide a coherent and comprehensive answer to all railway issues on the Antequera-Granada-Almer\u00eda axis, which will transform and form the backbone of Andalusian railway mobility.<\/p>\n<p>The three informative studies will define the geometric, functional and operational aspects, so as to constitute a standard width homogeneous line, compatible with the rest of the Mediterranean Corridor and, by extension, with the trans-European corridor.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Ministry of Transport and Sustainable Mobility has commissioned the joint venture EI Antequera-Granada-Almer\u00eda, led by TYPSA, with the contract to carry out a feasibility study and three informative studies with which to provide a comprehensive response to railway connectivity between Antequera, Granada and Almer\u00eda. In this study, the itinerary will be analysed with the &#8230; <a title=\"Feasibility study of the Antequera-Granada-Almer\u00eda railway connection\" class=\"read-more\" href=\"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/\" aria-label=\"Read more about Feasibility study of the Antequera-Granada-Almer\u00eda railway connection\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":79274,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[440],"tags":[],"class_list":["post-79247","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-current-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Feasibility study of the Antequera-Granada-Almer\u00eda railway connection - Grupo TYPSA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Feasibility study of the Antequera-Granada-Almer\u00eda railway connection - Grupo TYPSA\" \/>\n<meta property=\"og:description\" content=\"The Ministry of Transport and Sustainable Mobility has commissioned the joint venture EI Antequera-Granada-Almer\u00eda, led by TYPSA, with the contract to carry out a feasibility study and three informative studies with which to provide a comprehensive response to railway connectivity between Antequera, Granada and Almer\u00eda. In this study, the itinerary will be analysed with the ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/\" \/>\n<meta property=\"og:site_name\" content=\"Grupo TYPSA\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-09T16:34:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-13T10:56:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"539\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cristina Ezquerra Boado\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Cristina Ezquerra Boado\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\\\/\"},\"author\":{\"name\":\"Cristina Ezquerra Boado\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/person\\\/4b798f83d9c8c4ea1c0fb471926d3aa3\"},\"headline\":\"Feasibility study of the Antequera-Granada-Almer\u00eda railway connection\",\"datePublished\":\"2025-01-09T16:34:28+00:00\",\"dateModified\":\"2025-03-13T10:56:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\\\/\"},\"wordCount\":552,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/ANTEQUERA.jpg\",\"articleSection\":[\"Current News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.typsa.com\\\/en\\\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\\\/\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\\\/\",\"name\":\"Feasibility study of the Antequera-Granada-Almer\u00eda railway connection - Grupo TYPSA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/ANTEQUERA.jpg\",\"datePublished\":\"2025-01-09T16:34:28+00:00\",\"dateModified\":\"2025-03-13T10:56:51+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.typsa.com\\\/en\\\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/ANTEQUERA.jpg\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/ANTEQUERA.jpg\",\"width\":1024,\"height\":539},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Feasibility study of the Antequera-Granada-Almer\u00eda railway connection\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\",\"name\":\"Grupo TYPSA\",\"description\":\"Grupo TYPSA\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\",\"name\":\"Grupo TYPSA\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/logo-grupo-Typsa-300x300-1.png\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/logo-grupo-Typsa-300x300-1.png\",\"width\":300,\"height\":300,\"caption\":\"Grupo TYPSA\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/person\\\/4b798f83d9c8c4ea1c0fb471926d3aa3\",\"name\":\"Cristina Ezquerra Boado\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776931717\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776931717\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776931717\",\"caption\":\"Cristina Ezquerra Boado\"},\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/author\\\/ceb\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Feasibility study of the Antequera-Granada-Almer\u00eda railway connection - Grupo TYPSA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/","og_locale":"en_US","og_type":"article","og_title":"Feasibility study of the Antequera-Granada-Almer\u00eda railway connection - Grupo TYPSA","og_description":"The Ministry of Transport and Sustainable Mobility has commissioned the joint venture EI Antequera-Granada-Almer\u00eda, led by TYPSA, with the contract to carry out a feasibility study and three informative studies with which to provide a comprehensive response to railway connectivity between Antequera, Granada and Almer\u00eda. In this study, the itinerary will be analysed with the ... Read more","og_url":"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/","og_site_name":"Grupo TYPSA","article_published_time":"2025-01-09T16:34:28+00:00","article_modified_time":"2025-03-13T10:56:51+00:00","og_image":[{"width":1024,"height":539,"url":"https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA.jpg","type":"image\/jpeg"}],"author":"Cristina Ezquerra Boado","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Cristina Ezquerra Boado","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/#article","isPartOf":{"@id":"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/"},"author":{"name":"Cristina Ezquerra Boado","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3"},"headline":"Feasibility study of the Antequera-Granada-Almer\u00eda railway connection","datePublished":"2025-01-09T16:34:28+00:00","dateModified":"2025-03-13T10:56:51+00:00","mainEntityOfPage":{"@id":"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/"},"wordCount":552,"commentCount":0,"publisher":{"@id":"https:\/\/www.typsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/#primaryimage"},"thumbnailUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA.jpg","articleSection":["Current News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/","url":"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/","name":"Feasibility study of the Antequera-Granada-Almer\u00eda railway connection - Grupo TYPSA","isPartOf":{"@id":"https:\/\/www.typsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/#primaryimage"},"image":{"@id":"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/#primaryimage"},"thumbnailUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA.jpg","datePublished":"2025-01-09T16:34:28+00:00","dateModified":"2025-03-13T10:56:51+00:00","breadcrumb":{"@id":"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/#primaryimage","url":"https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA.jpg","contentUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/ANTEQUERA.jpg","width":1024,"height":539},{"@type":"BreadcrumbList","@id":"https:\/\/www.typsa.com\/en\/feasibility-study-of-the-antequera-granada-almeria-railway-connection\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.typsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"Feasibility study of the Antequera-Granada-Almer\u00eda railway connection"}]},{"@type":"WebSite","@id":"https:\/\/www.typsa.com\/en\/#website","url":"https:\/\/www.typsa.com\/en\/","name":"Grupo TYPSA","description":"Grupo TYPSA","publisher":{"@id":"https:\/\/www.typsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.typsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.typsa.com\/en\/#organization","name":"Grupo TYPSA","url":"https:\/\/www.typsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png","contentUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png","width":300,"height":300,"caption":"Grupo TYPSA"},"image":{"@id":"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3","name":"Cristina Ezquerra Boado","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776931717","url":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776931717","contentUrl":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1776931717","caption":"Cristina Ezquerra Boado"},"url":"https:\/\/www.typsa.com\/en\/author\/ceb\/"}]}},"_links":{"self":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/79247","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/comments?post=79247"}],"version-history":[{"count":4,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/79247\/revisions"}],"predecessor-version":[{"id":79276,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/79247\/revisions\/79276"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/media\/79274"}],"wp:attachment":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/media?parent=79247"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/categories?post=79247"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/tags?post=79247"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}