{"id":76721,"date":"2023-10-23T09:52:47","date_gmt":"2023-10-23T08:52:47","guid":{"rendered":"https:\/\/www.typsa.com\/?p=76721"},"modified":"2024-02-08T16:00:06","modified_gmt":"2024-02-08T15:00:06","slug":"typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania","status":"publish","type":"post","link":"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/","title":{"rendered":"TYPSA is part of the Kigoma-Tabora section railway expansion, in Tanzania"},"content":{"rendered":"<p><span data-contrast=\"none\">The Government of the United Republic of Tanzania, through its Tanzanian Railway Corporation (TRC), has launched the construction of the second phase of the Standard International Gauge Railway (SGR) that will link Dar es Salaam on the coast of the Indian Ocean with Mwanza on Lake Victoria, and Kigoma, on Lake Tanganyika. This second phase connects the cities of Kigoma and Tabora, joining with the first phase between Dar es Salaam and Mwanza, already under construction.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">The first phase, called the Central Line, has a total length of 1,219 km and connects the old capital with Lake Victoria, passing through the cities of Pwani, Morogoro, Dodoma (current capital), Singid, and Tabora to Mwanza. The Government of Tanzania is providing the funding, with an investment of USD 6,380,000.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">The second phase will expand the national rail network and connect Tanzania with neighbouring countries, Burundi and the Democratic Republic of the Congo, extending the international network to approximately 2,000 km. The new line will accommodate passenger and freight trains, which will run at a maximum speed of 160 km\/h and 120 km\/h respectively, with alignment running parallel to the current metric width track.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">This phase will be built through a \u201cDesign Build\u201d contract, awarded to a consortium of Chinese companies, with an estimated investment of USD 3,000 million.\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">Consultancy services for construction supervision have been awarded to a consortium of four companies of various nationalities in which TYPSA participates. Services include detailed design review, including verification of environmental safeguards, construction supervision, including civil works, electrification and signalling and telecommunications systems, and construction contract management.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">The total length is 506 km of international wide single track for mixed traffic, with 411 km of main line and 95 km of sidings. The scope is for one main station, six small stations, three medium stations and a sorting station. Supervision work covers all civil works, stations, electrification, signalling systems and telecommunications. The estimated duration of the design review is 18 months, overlapping with the 48 months of construction supervision and a 12-month guarantee period.<\/span><span data-contrast=\"none\">\u00a0<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"none\">The overall objective of the project is to reduce transport costs, providing efficient transport and contributing to improved economic development. With this, the expected results are:<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"none\">Improvement of the connection of landlocked countries, in particular Burundi and the Democratic Republic of the Congo, with the world economy.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:80,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"none\">Improvement of rail transport reliability, via the Central Line, in the interior of Tanzania.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:80,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"none\">Continuation of the expansion of Tanzania\u2019s standard-width electrified rail network, to achieve greater logistic efficiency in the country, due to its high capacity and reliability.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:80,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"none\">Unlocking the vast domestic mineral resources and facilitating lower transport costs.<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:80,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"none\">Connecting the Central Line with the port of Kigoma to serve the countries with land connection, the Democratic Republic of Congo and Burundi, with possible service to Rwanda and Zambia via Lake Tanganyika.<\/span><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>The Government of the United Republic of Tanzania, through its Tanzanian Railway Corporation (TRC), has launched the construction of the second phase of the Standard International Gauge Railway (SGR) that will link Dar es Salaam on the coast of the Indian Ocean with Mwanza on Lake Victoria, and Kigoma, on Lake Tanganyika. This second phase &#8230; <a title=\"TYPSA is part of the Kigoma-Tabora section railway expansion, in Tanzania\" class=\"read-more\" href=\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/\" aria-label=\"Read more about TYPSA is part of the Kigoma-Tabora section railway expansion, in Tanzania\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":76719,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[440],"tags":[],"class_list":["post-76721","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-current-news"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>TYPSA is part of the Kigoma-Tabora section railway expansion, in Tanzania - Grupo TYPSA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"TYPSA is part of the Kigoma-Tabora section railway expansion, in Tanzania - Grupo TYPSA\" \/>\n<meta property=\"og:description\" content=\"The Government of the United Republic of Tanzania, through its Tanzanian Railway Corporation (TRC), has launched the construction of the second phase of the Standard International Gauge Railway (SGR) that will link Dar es Salaam on the coast of the Indian Ocean with Mwanza on Lake Victoria, and Kigoma, on Lake Tanganyika. This second phase ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/\" \/>\n<meta property=\"og:site_name\" content=\"Grupo TYPSA\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-23T08:52:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-02-08T15:00:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.typsa.com\/wp-content\/uploads\/TANZANIA2_NEWS.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"655\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Cristina Ezquerra Boado\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Cristina Ezquerra Boado\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/\"},\"author\":{\"name\":\"Cristina Ezquerra Boado\",\"@id\":\"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3\"},\"headline\":\"TYPSA is part of the Kigoma-Tabora section railway expansion, in Tanzania\",\"datePublished\":\"2023-10-23T08:52:47+00:00\",\"dateModified\":\"2024-02-08T15:00:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/\"},\"wordCount\":472,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.typsa.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.typsa.com\/wp-content\/uploads\/TANZANIA2_NEWS.jpg\",\"articleSection\":[\"Current News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/\",\"url\":\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/\",\"name\":\"TYPSA is part of the Kigoma-Tabora section railway expansion, in Tanzania - Grupo TYPSA\",\"isPartOf\":{\"@id\":\"https:\/\/www.typsa.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.typsa.com\/wp-content\/uploads\/TANZANIA2_NEWS.jpg\",\"datePublished\":\"2023-10-23T08:52:47+00:00\",\"dateModified\":\"2024-02-08T15:00:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#primaryimage\",\"url\":\"https:\/\/www.typsa.com\/wp-content\/uploads\/TANZANIA2_NEWS.jpg\",\"contentUrl\":\"https:\/\/www.typsa.com\/wp-content\/uploads\/TANZANIA2_NEWS.jpg\",\"width\":1024,\"height\":655},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.typsa.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"TYPSA is part of the Kigoma-Tabora section railway expansion, in Tanzania\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.typsa.com\/en\/#website\",\"url\":\"https:\/\/www.typsa.com\/en\/\",\"name\":\"Grupo TYPSA\",\"description\":\"Grupo TYPSA\",\"publisher\":{\"@id\":\"https:\/\/www.typsa.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.typsa.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.typsa.com\/en\/#organization\",\"name\":\"Grupo TYPSA\",\"url\":\"https:\/\/www.typsa.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png\",\"contentUrl\":\"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png\",\"width\":300,\"height\":300,\"caption\":\"Grupo TYPSA\"},\"image\":{\"@id\":\"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3\",\"name\":\"Cristina Ezquerra Boado\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1775116944\",\"url\":\"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1775116944\",\"contentUrl\":\"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1775116944\",\"caption\":\"Cristina Ezquerra Boado\"},\"url\":\"https:\/\/www.typsa.com\/en\/author\/ceb\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"TYPSA is part of the Kigoma-Tabora section railway expansion, in Tanzania - Grupo TYPSA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/","og_locale":"en_US","og_type":"article","og_title":"TYPSA is part of the Kigoma-Tabora section railway expansion, in Tanzania - Grupo TYPSA","og_description":"The Government of the United Republic of Tanzania, through its Tanzanian Railway Corporation (TRC), has launched the construction of the second phase of the Standard International Gauge Railway (SGR) that will link Dar es Salaam on the coast of the Indian Ocean with Mwanza on Lake Victoria, and Kigoma, on Lake Tanganyika. This second phase ... Read more","og_url":"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/","og_site_name":"Grupo TYPSA","article_published_time":"2023-10-23T08:52:47+00:00","article_modified_time":"2024-02-08T15:00:06+00:00","og_image":[{"width":1024,"height":655,"url":"https:\/\/www.typsa.com\/wp-content\/uploads\/TANZANIA2_NEWS.jpg","type":"image\/jpeg"}],"author":"Cristina Ezquerra Boado","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Cristina Ezquerra Boado","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#article","isPartOf":{"@id":"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/"},"author":{"name":"Cristina Ezquerra Boado","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3"},"headline":"TYPSA is part of the Kigoma-Tabora section railway expansion, in Tanzania","datePublished":"2023-10-23T08:52:47+00:00","dateModified":"2024-02-08T15:00:06+00:00","mainEntityOfPage":{"@id":"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/"},"wordCount":472,"commentCount":0,"publisher":{"@id":"https:\/\/www.typsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#primaryimage"},"thumbnailUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/TANZANIA2_NEWS.jpg","articleSection":["Current News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/","url":"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/","name":"TYPSA is part of the Kigoma-Tabora section railway expansion, in Tanzania - Grupo TYPSA","isPartOf":{"@id":"https:\/\/www.typsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#primaryimage"},"image":{"@id":"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#primaryimage"},"thumbnailUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/TANZANIA2_NEWS.jpg","datePublished":"2023-10-23T08:52:47+00:00","dateModified":"2024-02-08T15:00:06+00:00","breadcrumb":{"@id":"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#primaryimage","url":"https:\/\/www.typsa.com\/wp-content\/uploads\/TANZANIA2_NEWS.jpg","contentUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/TANZANIA2_NEWS.jpg","width":1024,"height":655},{"@type":"BreadcrumbList","@id":"https:\/\/www.typsa.com\/en\/typsa-is-part-of-the-kigoma-tabora-section-railway-expansion-in-tanzania\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.typsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"TYPSA is part of the Kigoma-Tabora section railway expansion, in Tanzania"}]},{"@type":"WebSite","@id":"https:\/\/www.typsa.com\/en\/#website","url":"https:\/\/www.typsa.com\/en\/","name":"Grupo TYPSA","description":"Grupo TYPSA","publisher":{"@id":"https:\/\/www.typsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.typsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.typsa.com\/en\/#organization","name":"Grupo TYPSA","url":"https:\/\/www.typsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png","contentUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png","width":300,"height":300,"caption":"Grupo TYPSA"},"image":{"@id":"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/person\/4b798f83d9c8c4ea1c0fb471926d3aa3","name":"Cristina Ezquerra Boado","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1775116944","url":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1775116944","contentUrl":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/09e8cb539aed2a01b70e685692f432ed.jpg?ver=1775116944","caption":"Cristina Ezquerra Boado"},"url":"https:\/\/www.typsa.com\/en\/author\/ceb\/"}]}},"_links":{"self":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/76721","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/comments?post=76721"}],"version-history":[{"count":1,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/76721\/revisions"}],"predecessor-version":[{"id":76722,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/76721\/revisions\/76722"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/media\/76719"}],"wp:attachment":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/media?parent=76721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/categories?post=76721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/tags?post=76721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}