{"id":54143,"date":"2018-08-21T13:24:06","date_gmt":"2018-08-21T12:24:06","guid":{"rendered":"https:\/\/www.typsa.com\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/"},"modified":"2022-06-13T17:30:58","modified_gmt":"2022-06-13T16:30:58","slug":"widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2","status":"publish","type":"post","link":"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/","title":{"rendered":"Widening the cable-stayed bridge over the Rande strait: an engineering milestone"},"content":{"rendered":"<p><img decoding=\"async\" style=\"margin-right: 15px; padding: 5px;\" src=\"\/files\/RandeNews.jpg\" alt=\"\" width=\"100%\" height=\"100%\" align=\"left\" \/><\/p>\n<p style=\"color: #444444;\">The AP-9 Atlantic Motorway crosses the Vigo estuary via the 400-metre-span, cable-stayed Rande Bridge. Widening the Rande Bridge forms part of the motorway expansion works that will achieve a 42% capacity increase and address rising traffic volumes.<\/p>\n<p style=\"color: #444444;\">The works to widen the iconic Rande Bridge were the most spectacular of all the widening works between O Morrazo and Teis, due to their technical complexity. They were based on three fundamental design considerations: maximum use of the existing bridge structure, zero impact on traffic and road safety, and zero environmental impact on the estuary.<\/p>\n<p style=\"color: #444444;\">The design solution comprises a new carriageway in each direction added to both external sides of the existing deck, thus widening the bridge capacity from two to three lanes in each direction. The new carriageways are suspended by two new families of stays anchored to the towers using a special steel box structure.<\/p>\n<p style=\"color: #444444;\">Works were carried out from the sea using construction systems that were specifically designed to meet the design considerations. The deck was widened in a record time of 18 months.<\/p>\n<p style=\"color: #444444;\">This project marks a global milestone for engineering, being the first time a long-span cable-stayed bridge has been widened. Moreover, the works were carried out without interrupting traffic on the existing bridge.<\/p>\n<p style=\"color: #444444;\">TYPSA Group\u2019s subsidiary, MC2 Estudio de Ingenier\u00eda, prepared the design to widen the cable-stayed bridge and provided the construction engineering and supervision services.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The AP-9 Atlantic Motorway crosses the Vigo estuary via the 400-metre-span, cable-stayed Rande Bridge. Widening the Rande Bridge forms part of the motorway expansion works that will achieve a 42% capacity increase and address rising traffic volumes. The works to widen the iconic Rande Bridge were the most spectacular of all the widening works between &#8230; <a title=\"Widening the cable-stayed bridge over the Rande strait: an engineering milestone\" class=\"read-more\" href=\"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/\" aria-label=\"Read more about Widening the cable-stayed bridge over the Rande strait: an engineering milestone\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":52645,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[429,430],"tags":[],"class_list":["post-54143","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-_front-page-en","category-highlights-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Widening the cable-stayed bridge over the Rande strait: an engineering milestone - Grupo TYPSA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Widening the cable-stayed bridge over the Rande strait: an engineering milestone - Grupo TYPSA\" \/>\n<meta property=\"og:description\" content=\"The AP-9 Atlantic Motorway crosses the Vigo estuary via the 400-metre-span, cable-stayed Rande Bridge. Widening the Rande Bridge forms part of the motorway expansion works that will achieve a 42% capacity increase and address rising traffic volumes. The works to widen the iconic Rande Bridge were the most spectacular of all the widening works between ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Grupo TYPSA\" \/>\n<meta property=\"article:published_time\" content=\"2018-08-21T12:24:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-06-13T16:30:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.typsa.com\/wp-content\/uploads\/05.Rande_.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"750\" \/>\n\t<meta property=\"og:image:height\" content=\"386\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"ensalza\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ensalza\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\\\/\"},\"author\":{\"name\":\"ensalza\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/person\\\/96823f82f80793785e70a4217760bcfc\"},\"headline\":\"Widening the cable-stayed bridge over the Rande strait: an engineering milestone\",\"datePublished\":\"2018-08-21T12:24:06+00:00\",\"dateModified\":\"2022-06-13T16:30:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\\\/\"},\"wordCount\":242,\"publisher\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/05.Rande_.jpg\",\"articleSection\":[\"Front page\",\"Highlights\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\\\/\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\\\/\",\"name\":\"Widening the cable-stayed bridge over the Rande strait: an engineering milestone - Grupo TYPSA\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/05.Rande_.jpg\",\"datePublished\":\"2018-08-21T12:24:06+00:00\",\"dateModified\":\"2022-06-13T16:30:58+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.typsa.com\\\/en\\\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/05.Rande_.jpg\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/05.Rande_.jpg\",\"width\":750,\"height\":386},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Widening the cable-stayed bridge over the Rande strait: an engineering milestone\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\",\"name\":\"Grupo TYPSA\",\"description\":\"Grupo TYPSA\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#organization\",\"name\":\"Grupo TYPSA\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/logo-grupo-Typsa-300x300-1.png\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/uploads\\\/logo-grupo-Typsa-300x300-1.png\",\"width\":300,\"height\":300,\"caption\":\"Grupo TYPSA\"},\"image\":{\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/#\\\/schema\\\/person\\\/96823f82f80793785e70a4217760bcfc\",\"name\":\"ensalza\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/a0d7e036bc1aef110d727293962e34c8.jpg?ver=1776933352\",\"url\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/a0d7e036bc1aef110d727293962e34c8.jpg?ver=1776933352\",\"contentUrl\":\"https:\\\/\\\/www.typsa.com\\\/wp-content\\\/litespeed\\\/avatar\\\/a0d7e036bc1aef110d727293962e34c8.jpg?ver=1776933352\",\"caption\":\"ensalza\"},\"sameAs\":[\"https:\\\/\\\/www.typsa.com\"],\"url\":\"https:\\\/\\\/www.typsa.com\\\/en\\\/author\\\/ensalza\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Widening the cable-stayed bridge over the Rande strait: an engineering milestone - Grupo TYPSA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/","og_locale":"en_US","og_type":"article","og_title":"Widening the cable-stayed bridge over the Rande strait: an engineering milestone - Grupo TYPSA","og_description":"The AP-9 Atlantic Motorway crosses the Vigo estuary via the 400-metre-span, cable-stayed Rande Bridge. Widening the Rande Bridge forms part of the motorway expansion works that will achieve a 42% capacity increase and address rising traffic volumes. The works to widen the iconic Rande Bridge were the most spectacular of all the widening works between ... Read more","og_url":"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/","og_site_name":"Grupo TYPSA","article_published_time":"2018-08-21T12:24:06+00:00","article_modified_time":"2022-06-13T16:30:58+00:00","og_image":[{"width":750,"height":386,"url":"https:\/\/www.typsa.com\/wp-content\/uploads\/05.Rande_.jpg","type":"image\/jpeg"}],"author":"ensalza","twitter_card":"summary_large_image","twitter_misc":{"Written by":"ensalza","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/#article","isPartOf":{"@id":"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/"},"author":{"name":"ensalza","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/person\/96823f82f80793785e70a4217760bcfc"},"headline":"Widening the cable-stayed bridge over the Rande strait: an engineering milestone","datePublished":"2018-08-21T12:24:06+00:00","dateModified":"2022-06-13T16:30:58+00:00","mainEntityOfPage":{"@id":"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/"},"wordCount":242,"publisher":{"@id":"https:\/\/www.typsa.com\/en\/#organization"},"image":{"@id":"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/05.Rande_.jpg","articleSection":["Front page","Highlights"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/","url":"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/","name":"Widening the cable-stayed bridge over the Rande strait: an engineering milestone - Grupo TYPSA","isPartOf":{"@id":"https:\/\/www.typsa.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/#primaryimage"},"image":{"@id":"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/#primaryimage"},"thumbnailUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/05.Rande_.jpg","datePublished":"2018-08-21T12:24:06+00:00","dateModified":"2022-06-13T16:30:58+00:00","breadcrumb":{"@id":"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/#primaryimage","url":"https:\/\/www.typsa.com\/wp-content\/uploads\/05.Rande_.jpg","contentUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/05.Rande_.jpg","width":750,"height":386},{"@type":"BreadcrumbList","@id":"https:\/\/www.typsa.com\/en\/widening-the-cable-stayed-bridge-over-the-rande-strait-an-engineering-milestone-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.typsa.com\/en\/"},{"@type":"ListItem","position":2,"name":"Widening the cable-stayed bridge over the Rande strait: an engineering milestone"}]},{"@type":"WebSite","@id":"https:\/\/www.typsa.com\/en\/#website","url":"https:\/\/www.typsa.com\/en\/","name":"Grupo TYPSA","description":"Grupo TYPSA","publisher":{"@id":"https:\/\/www.typsa.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.typsa.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.typsa.com\/en\/#organization","name":"Grupo TYPSA","url":"https:\/\/www.typsa.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png","contentUrl":"https:\/\/www.typsa.com\/wp-content\/uploads\/logo-grupo-Typsa-300x300-1.png","width":300,"height":300,"caption":"Grupo TYPSA"},"image":{"@id":"https:\/\/www.typsa.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.typsa.com\/en\/#\/schema\/person\/96823f82f80793785e70a4217760bcfc","name":"ensalza","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/a0d7e036bc1aef110d727293962e34c8.jpg?ver=1776933352","url":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/a0d7e036bc1aef110d727293962e34c8.jpg?ver=1776933352","contentUrl":"https:\/\/www.typsa.com\/wp-content\/litespeed\/avatar\/a0d7e036bc1aef110d727293962e34c8.jpg?ver=1776933352","caption":"ensalza"},"sameAs":["https:\/\/www.typsa.com"],"url":"https:\/\/www.typsa.com\/en\/author\/ensalza\/"}]}},"_links":{"self":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/54143","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/comments?post=54143"}],"version-history":[{"count":0,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/posts\/54143\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/media\/52645"}],"wp:attachment":[{"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/media?parent=54143"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/categories?post=54143"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.typsa.com\/en\/wp-json\/wp\/v2\/tags?post=54143"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}