Asturias, Spain

VIADUCT OVER THE RIVER NALÓN

Year

2006

Key facts

Steel-concrete composite deck. Box girder cross section widened by upper flange bracing. 1,101 m total length and 124 m main span.

Services

Detailed design by MC2 (TYPSA Group).