Spain

VALENCIA TRAMWAY

Client

Valencia Regional Government.

Year

2007

Construction budget

USD 250 million.

Key facts

Project length: 3.1 km. The underground line 2 is intended to create a new connection between the North and South areas of the city, through the historic city centre. 1.6 km of bored tunnel, 0.9 km of cut-and-cover tunnel and 0.6 km at-grade. 4 underground stops and one at-grade.

Services

Preliminary studies and detailed design.