Key facts
Widening from three to four lanes on a 2.3 km section, including the refurbishment of the cycle path alongside the road, between the towns of Ekerö and Lindö.
Demolition of a 160 m concrete bridge and construction of a new 120 m span movable bridge over the Rivera Tappström.
Rebuilding of the Färingsö roundabout.