Bogota, Colombia

SALITRE WASTEWATER TREATMENT PLANT

Client

Aqualia México

Year

2019

Construction budget

EUR 405 million

Key facts

Average flow of 7.0 m3/s, peak flow of 14.0 m3/s. Beneficiary population of 3 million. Treatment: activated sludge (nutrient removal), anaerobic digestion and power co-generation. Foundation on extremely compressive (loose) soils affected by long term consolidation process due to uncontrolled landfill and regional settlements. Design of foundations with long term settlement analysis.

Services

Detailed design of WWTP civil works, M&E and instrumentation-control. Geotechnical field works.