Arequipa, Peru

PORT OF MATARANI

Client

TISUR

Year

2016

Key facts

200 m long pile-supported pier, equipped with a rail-mounted shiploader. Depth of 20 m. 171 m long access bridge built on pile foundations. 480 m long 8-track railway. Warehouses and buildings for the reception of ore.

Services

Supervision of design and construction