Argentina

MIRAMAR WIND FARM

Client

Goldwind International

Year

2020

Construction budget

USD 200 million

Key facts

– Total Power: 98.7MW, 29 x GW140-3.1MW, HH130

– Comprising a 132/33 kV outdoor air insulated substation (AIS) with a double busbar arrangement, two line bays, two transformer and coupling bays, two 60 MVA power transformers and 6 collector lines (Miramar)

– The 132 kV HV overhead line connects the existing Miramar 132/33/13,2 kV and Necochea 132/33/13,2kV TRANSBA substations

– Line bays were adapted at the existing Miramar 132/33/13.2 kV and Necochea 132/33/13.2kV TRANSBA substations for generation substation interconnection.

Services

Owner’s engineering – tender engineering, support during the bidding process, preparation of the Terms of Reference, selection and evaluation of contractors and preparation of the technical EPC contract annexes. Review of contractor’s engineering, project quality management, project management and construction management.