Lima, Peru

LIMA NORTE II DRINKING WATER AND SEWERAGE SYSTEM

Client

Lima Potable Water and Sewerage Service (SEDAPAL) with funding from the Japanese International Cooperation Agency (JICA)

Year

2018

Construction budget

USD 571 million

Key facts

Area of influence of the Huachipa water treatment plant and the drainage area covering Comas, Carabayllo, Los Olivos, Puente de Piedra, San Martin de Porres, Callao and Ventanilla districts (North Lima Area II). Cadastre for existing networks, diagnosis and engineering works to design: 90 km of new pipeline and renovate 420 km of pipeline; renovation of 70,289 existing household connections; installation of 10,537 household micrometers in PVC and PE pipes; rehabilitation of 1400 inspection chambers, and new construction of another 3,300; supply and installation of a SCADA system; rehabilitation of 4 drinking water pumping stations; renovation of 33,736 household sanitation connections; rehabilitation of 26 tanks and 23 wells providing sanitation services to more than 1 million inhabitants.

Services

Detailed design of the modernisation and optimisation of existing water supply and sanitation systems. Environmental and archaeological impact assessment and social strategy. Preparation of the contract documents for the construction works in the 2nd phase.