Madrid, España

HSR LINK BETWEEN ATOCHA AND CHAMARTÍN STATIONS

Client

ADIF

Year

2008

Construction budget

EUR 285 million.

Key facts

Urban tunnel 7 km in length, bored with an 11.5 m outer diameter TBM-EPB. 9 shafts. 3 emergency exits.

Services

Preliminary design, detailed design and works supervision.