United Kingdom
HS2 HIGH SPEED RAIL LINE. BIRMINGHAM - LEEDS
Client
Year
2023
Key facts
Phase 2b – Lot 3 (Tibshelf — Leeds)
– Total length of 112 km.
– Connections to existing conventional rail network (East and West Coast Main Lines; Northern Powerhouse Rail; Midland Main Line).
– 1 cut-and-cover tunnel
– 1 TBM bored tunnel 1.15 km long with an internal diameter of 7.55 m.
– 3 SCL (Sprayed Concrete Lining) cross passages