Key facts
Project length of 24 km. Highway improvement. Two additional Tolled Express Lanes (TELs) in each direction (High Occupancy Vehicle (HOV) lanes).
Outside widening of existing freeway and 11 bridge widenings and numerous retaining/sound walls. Significant river crossing over the Santa Ana River. Toll Collection System infrastructure.