Bolivia

EL CARRIZAL HYDROELECTRIC POWER PLANT

Client

Bolivian National Electricity Company (ENDE).

Year

2018

Key facts

Hydroelectric power plant with 3 generating units. Gross head: 850 m. Total turbine flow: 51 m3/s. Power: 366 MW. Roller-compacted concrete dam, 160 m high, with a crest length of 379.5 m. Spillway design flow: 3,994 m3/s. 220/13,8 kV high voltage step-up substation and 96 km long high-voltage transmission line.

Services

Final design, geological and seismic site studies, inlcuding field works and a pilot gallery for testing.