Key facts
The project involved widening a total of 151 km of the Eje Transversal (transversal arterial road) between Cervera and Caldes de Malavella, in 3 sections:
Cervera-Manresa section. Project length of 49 km with viaducts over the Riera de Rajadell and one interchange.
Manresa-Vic section. Project length of 46 km with 12 viaducts, 1 tunnel 731 m long and 13 new interchanges.
Vic-Caldes de Malavella section. Project length of 57 km with 17 viaducts, 7 tunnels, 5 cut-and-cover tunnels.