Honduras

Bulk terminal at Puerto Cortés

Client

Puertos Marítimos de Honduras PMH and Banco Atlántida

Year

2012

Key facts

Modernisation of Quay 3: demolition and replacement of damaged structures, reinforcement of damaged dock. 417 m long, 14 m water depth. Quay 3 expansion: 215 m long and 22.20 m wide pile-supported pier. Highly compressible and loose soil to great depths. Initial investment of USD 32.7 million.

Services

Feasibility study, detailed design and supervision of the modernisation works to improve the capacity and efficiency of the bulk terminal.

Financial viability: concession company revenue estimates and projections, determination of an operating cost structure, preparation of a financial model to estimate the financial viability and possible financial structures of the concession as a PPP.