Cáceres, Spain

BRIDGE OVER THE TAGUS RIVER AT THE ALCANTARA RESERVOIR

Year

2010

Key facts

On the Madrid – Lisbon High Speed Railway Line. Concrete deck arch bridge. 1,488 m total length and 324 m main span.

Services

Detailed design in collaboration with Professor Javier Manterola Armisén.