Madrid, Spain

BRIDGE AT SOUTH EXIT FROM ATOCHA STATION

Year

2011

Key facts

Reinforced concrete slab supported by built-up steel girders connected to steel trusses at either side of the deck. 130 m total length and 45.50 m main span.

Services

Detailed design by MC2 (TYPSA Group).